View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | At Document:[TDS;C.Qualification Criteria ; ITT- Clause(15- Experience Criteria)] |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 29/11/2022 15:30 | 11/12/2022 15:30 |
| Eligibility of Consultant | Submitted Tenderer will be treated as " Non-Responsive" due to the failure of submission of following eligibility documents related to the Tenderer: a) Upload the copy of updated Trade License, TIN and VAT Certificate. b) The certificates to be submitted by the tenderer in proof specific or Average Annual (AACT) must have the information such as particulars of PE including email address and contact no,business share in case of JV , time extension ,liquidity damage, Contract and final bill amount etc . Failing in doing so will turn the submitted tender as "Non-Responsive" . A sample is attached in the particular conditions for reference . c) Tenderer should submit the information related to " Tender Capacity" as per standard format provided in particular conditions. d) It can be noted that submission of any fake/false document will result in the submitted tender as " Non-Responsive" and step will be taken against the concerned tenderer according to PPA,2006 and PPR 2008( last amendment) . |
Submitted Tenderer will be treated as " Non-Responsive" due to the failure of submission of following eligibility documents related to the Tenderer: a) Upload the copy of updated Trade License, TIN and VAT Certificate. b) The certificates to be submitted by the tenderer in proof specific or Average Annual (AACT) must have the information such as particulars of PE including email address and contact no,business share in case of JV , time extension ,liquidity damage, Contract and final bill amount etc . Failing in doing so will turn the submitted tender as "Non-Responsive" . A sample is attached in the particular conditions for reference . c) Tenderer should submit the information related to " Tender Capacity" as per standard format provided in particular conditions. d) It can be noted that submission of any fake/false document will result in the submitted tender as " Non-Responsive" and step will be taken against the concerned tenderer according to PPA,2006 and PPR 2008( last amendment) . |
| Opening Date & Time | 30/11/2022 11:30 | 12/12/2022 11:30 |
| Meeting End Date & Time | 28/11/2022 14:30 | 08/12/2022 14:30 |
| Last date & time for Tender/Proposal Security Submission | 30/11/2022 11:00 | 12/12/2022 11:00 |
| Start Date(Lot No : 1) | 19/12/2022 | 29/12/2022 |
| Closing Date & Time | 30/11/2022 11:30 | 12/12/2022 11:30 |
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(Five)years. Years will be counting backward from the date of publication of IFT in eGP Portal .
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01(One)contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05(Five)years, each with a value of at least Tk. 1,50,00,000(One Crore and Fifty Thousand). Years will be counting backward from the date of publication of IFT in eGP Portal .
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(Five)years. Years will be counting backward from the date of publication of IFT in eGP Portal .
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01(One)contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05(Five)years, each with a value of at least Tk. 1,40,00,000(One Crore and Forty Lakhs). Years will be counting backward from the date of publication of IFT in eGP Portal .
|
| Brief Description of Goods,Works or Service | Installation of 500 (Five Hundred) nos. Rain Water Harvesting (RWH) at Rupsha Upazila-280 nos. & Terokhada Upazila-220 nos. in Khulna District Under Arsenic Risk Reduction Project on Water Supply (ARRP) of Department of Public Health Engineering. FY: 2022-2023. |
Installation of 500 (Five Hundred) nos. Rain Water Harvesting (RWH) at Rupsha Upazila-280 nos. & Terokhada Upazila-220 nos. in Khulna District Under Arsenic Risk Reduction Project on Water Supply (ARRP) of Department of Public Health Engineering. FY: 2022-2023. |