View IFT /PQ / REOI / RFP / PPS Notice Details
Amendment / Corrigendum Detail
|
Amendment / Corrigendum No. : 1
|
| Amendment / Corrigendum Text : |
Amendment/ Corrigendum : GCC Clause 31.2 |
| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
a) The tenderer’s having registered of CPTU
b) The tenderer shall have renewed up to date (2022-23) trade license, TIN & VAT registration Certificate
c) The minimum amount of free funds (liquid assete)/credit facilities Tk 21 lakh
d) Others terms and conditions will be mentioned in the tender schedule
e) A satisfactory completion of similar works (Similar works mins Pond/Khall Excavation) of at least Tk 21 Lac under 1 (One number) of contract(s) over a period of Last 5 Years shall be required.The certificate issuing officer shall not below the rank of an Executive Engineer.
All other conditions as mentioned in the terder document should be full filled by the tenderer
|
a) The tenderer’s having registered of CPTU
b) The tenderer shall have renewed up to date (2022-23) trade license, TIN & VAT registration Certificate
c) The minimum amount of free funds (liquid assete)/credit facilities Tk 21 lakh
d) Others terms and conditions will be mentioned in the tender schedule
e) A satisfactory completion of similar works (Similar works mins Pond/Khall Excavation) of at least Tk 21 Lac under 1 (One number) of contract(s) over a period of Last 5 Years shall be required.The certificate issuing officer shall not below the rank of an Executive Engineer.
All other conditions as mentioned in the terder document should be full filled by the tenderer
|
| PCC--D. Cost Control--
|
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.
[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]
|
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is 10 percent of the final Contract price of the whole of the Works.
|
| Brief Description of Goods,Works or Service
|
Re-Excavation of Khas Ponds by Excavator Machine including various lead and lift.
|
Re-Excavation of Khas Ponds by Excavator Machine including various lead and lift.
|