| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
a) The tenderer’s having registered of CPTU
b) The tenderer shall have renewed up to date (2022-23) trade license, TIN & VAT registration Certificate
c) The minimum amount of free funds (liquid assete)/credit facilities Tk 24 lakh
d) Others terms and conditions will be mentioned in the tender schedule
e) A satisfactory completion of similar works (Similar works mins Pond/Khall Excavation) of at least Tk 24 Lac under 1 (One number) of contract(s) over a period of Last 5 Years shall be required.The certificate issuing officer shall not below the rank of an Executive Engineer.
All other conditions as mentioned in the terder document should be full filled by the tenderer
|
a) The tenderer’s having registered of CPTU
b) The tenderer shall have renewed up to date (2022-23) trade license, TIN & VAT registration Certificate
c) The minimum amount of free funds (liquid assete)/credit facilities Tk 23 lakh
d) Others terms and conditions will be mentioned in the tender schedule
e) A satisfactory completion of similar works (Similar works mins Pond/Khall Excavation) of at least Tk 23 Lac under 1 (One number) of contract(s) over a period of Last 5 Years shall be required.The certificate issuing officer shall not below the rank of an Executive Engineer.
All other conditions as mentioned in the terder document should be full filled by the tenderer
|
| TDS/PDS--A. General--
|
|
The PE is [state name of PE]
|
|
The Name of the Tender is:
Brief Description of the Works:
Tender Ref:
Lot No(s):
[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities]
|
|
|
The PE is Md. Shariful Haque.Project DirectorSWIP, BMDA, Rajshahi.
|
|
The Name of the Tender is: Re-Excavation of Khas Ponds.
Tender Ref: Agri. Ministry Memo no- 367, Date- 27-11-2019.
Lot No(s): Single.
|
|
| TDS/PDS--B. Tender Document--
|
Allowed to post clarification till [Date and Time] |
Allowed to post clarification till N/A
|
| TDS/PDS--C. Qualification Criteria--
|
The minimum capacity shall be:[70%-80% of the official estimated cost]
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)
Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
|
The minimum capacity shall be:[70%-80% of the official estimated cost]
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)
Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
|
| TDS/PDS--D. Tender Preparation--
|
The amount of the Tender Security shall be [ state amount ]
[note: Not exceeding three percent (3%) of the official estimated cost but as a fixed amount]
|
The amount of the Tender Security shall be 2-3 %
|
| TDS/PDS--E. e-Tender Submission--
|
The deadline for lodgment of e-Tenders is [state time, and identify AM or PM e.g 10.30 a.m]
[state date, e.g 15 June,2011 ].
|
The deadline for lodgment of e-Tenders is As Per TDS
|
| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
a) The tenderer’s having registered of CPTU
b) The tenderer shall have renewed up to date (2022-23) trade license, TIN & VAT registration Certificate
c) The minimum amount of free funds (liquid assete)/credit facilities Tk 24 lakh
d) Others terms and conditions will be mentioned in the tender schedule
e) A satisfactory completion of similar works (Similar works mins Pond/Khall Excavation) of at least Tk 24 Lac under 1 (One number) of contract(s) over a period of Last 5 Years shall be required.The certificate issuing officer shall not below the rank of an Executive Engineer.
All other conditions as mentioned in the terder document should be full filled by the tenderer
|
a) The tenderer’s having registered of CPTU
b) The tenderer shall have renewed up to date (2022-23) trade license, TIN & VAT registration Certificate
c) The minimum amount of free funds (liquid assete)/credit facilities Tk 24 lakh
d) Others terms and conditions will be mentioned in the tender schedule
e) A satisfactory completion of similar works (Similar works mins Pond/Khall Excavation) of at least Tk 24 Lac under 1 (One number) of contract(s) over a period of Last 5 Years shall be required.The certificate issuing officer shall not below the rank of an Executive Engineer.
All other conditions as mentioned in the terder document should be full filled by the tenderer
|
| PCC--D. Cost Control--
|
The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
|
The amount of Liquidated Damages or in other words Delay Damages is 0.10 percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
|
| Brief Description of Goods,Works or Service
|
Re-Excavation of Khas Ponds by Excavator Machine including various lead and lift.
|
Re-Excavation of Khas Ponds by Excavator Machine including various lead and lift.
|