View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | 01 |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 10/01/2023 16:00 | 15/01/2023 12:00 |
| Eligibility of Consultant | All e-GP Registered Tenders who fulfill all the requirements as stated in the Tender. a) As per consent of CPTU, the Tenders shall be evaluated in the e-GP system with the help of online database system-TDMS. b) Qualification information and evidences (such as work experience certificates, on-going works list, payment certificates for construction turnover, equipment list (own or rented), personnel list etc. of the Tenderers as mapped in the e-GP Tenders must be available in the TDMS system so that TEC can evaluate the tenders digitally within short period of time. |
All e-GP Registered Tenders who fulfill all the requirements as stated in the Tender. a) As per consent of CPTU, the Tenders shall be evaluated in the e-GP system with the help of online database system-TDMS.
b) Qualification information and evidences (such as work experience certificates, on-going works list, payment certificates for construction turnover, equipment list (own or rented), personnel list etc. of the Tenderers as mapped in the e-GP Tenders must be available in the TDMS system so that TEC can evaluate the tenders digitally within short period of time. |
| Opening Date & Time | 11/01/2023 13:00 | 15/01/2023 15:00 |
| Last date & time for Tender/Proposal Security Submission | 11/01/2023 11:00 | 15/01/2023 14:00 |
| Closing Date & Time | 11/01/2023 13:00 | 15/01/2023 15:00 |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 3400.00 lac over the last 5(Five) years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
The required average annual construction turnover shall be greater than Tk 3400.00 lac over the last 5(Five) years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 1100.00 lac
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: Not applicable.
|
The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: Not applicable.
|
| Brief Description of Goods,Works or Service | Repairing Damaged Pavement under Periodic Maintenance Programme (PMP) by Providing Aggregate Base Type-I, DBS Base Course With DBST & Rigid Pavement work at Ch. 36+321 to 53+321 km of Naogoan-Atrai-Natore (Natore Part) (R-548) Road under Road Division Natore during the year 2022-2023. |
Repairing Damaged Pavement under Periodic Maintenance Programme (PMP) by Providing Aggregate Base Type-I, DBS Base Course With DBST & Rigid Pavement work at Ch. 36+321 to 53+321 km of Naogoan-Atrai-Natore (Natore Part) (R-548) Road under Road Division Natore during the year 2022-2023. |