As per tender document.
e-GP/NRD/work/2.6/2022-23
Pavement Repairing and Single Bituminous Surface Treatment (SBST) at chainage 8+084 km to 8+749 and 8+924 to 9+249 km of Baraigram-Zonail-Chatmohor Road (Z-6029) under Road Division, Natore during the year 2022-2023.