View IFT /PQ / REOI / RFP / PPS Notice Details
Amendment / Corrigendum Detail
|
Amendment / Corrigendum No. : 2
|
| Amendment / Corrigendum Text : |
Tender security submission date extended to 08/02/2023 |
| Field Name |
Old Value |
New Value |
| Last date & time for Tender/Proposal Security Submission
|
25/01/2023 17:00 |
08/02/2023 17:00 |
|
Amendment / Corrigendum No. : 1
|
| Amendment / Corrigendum Text : |
Due to more competition, tender opening date has been extended to 09/02/2023. |
| Field Name |
Old Value |
New Value |
| Document last selling date & time
|
25/01/2023 17:00 |
08/02/2023 17:00 |
| Eligibility of Consultant
|
a) Tenderer must be registered in the e-GP portal through CPTU along with a valid and updated Trade License, Vat Registration and TIN certificate.
b) Quoted amount of tenderer beyond 10% above/less than official estimated cost will be non-responsive.
c) It is the duty of the contractor to submit all the documents freshly (without corruption). If any documents get corrupted and the evaluation committee could not able to open the file, no claim from the tenderer will be entertained regarding the file.
d) Vat & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard.
e) Tender evaluation will be done following the latest gazette /circular from CPTU.
f) A detailed list of work in hand /ongoing works duly signed by the tenderer must be submitted.
g) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard.
h) If BWDB owned/acquired land is not sufficient to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost.
i) Quantity and quality of work must be checked by BWDB's Task Force.
j) Photo and video must have been taken by the contractor at a different angle during pre- work and post-work measurement and submitted to the PE. No extra claim will be entertained in this regard.
k) All other criteria are stated in the tender document.
|
a) Tenderer must be registered in the e-GP portal through CPTU along with a valid and updated Trade License, Vat Registration and TIN certificate.
b) Quoted amount of tenderer beyond 10% above/less than official estimated cost will be non-responsive.
c) It is the duty of the contractor to submit all the documents freshly (without corruption). If any documents get corrupted and the evaluation committee could not able to open the file, no claim from the tenderer will be entertained regarding the file.
d) Vat & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard.
e) Tender evaluation will be done following the latest gazette /circular from CPTU.
f) A detailed list of work in hand /ongoing works duly signed by the tenderer must be submitted.
g) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard.
h) If BWDB owned/acquired land is not sufficient to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost.
i) Quantity and quality of work must be checked by BWDB's Task Force.
j) Photo and video must have been taken by the contractor at a different angle during pre- work and post-work measurement and submitted to the PE. No extra claim will be entertained in this regard.
k) All other criteria are stated in the tender document.
|
| Opening Date & Time
|
26/01/2023 14:00 |
09/02/2023 14:00 |
| Closing Date & Time
|
26/01/2023 14:00 |
09/02/2023 14:00 |
| Brief Description of Goods,Works or Service
|
Re-excavation 15.500 km khal from 61.500 km of 20 nos khal under Polder No. 43/1(Dhopakhali Khal=4.000 km, Laxmir Khal=4.500 km, Purbochila khal & branch Khal=4.700 km and Singkhali Khal=2.300 km Total=15.500 km) Under "Rehabilitation of Polder 43/1 and 44B and protection of vulnerable portion from erosion of the Payra river under Barguna district" Project. (Package No. ATKRW-05)
|
Re-excavation 15.500 km khal from 61.500 km of 20 nos khal under Polder No. 43/1(Dhopakhali Khal=4.000 km, Laxmir Khal=4.500 km, Purbochila khal & branch Khal=4.700 km and Singkhali Khal=2.300 km Total=15.500 km) Under "Rehabilitation of Polder 43/1 and 44B and protection of vulnerable portion from erosion of the Payra river under Barguna district" Project. (Package No. ATKRW-05)
|