As a stated in tender document.
On main line in STK-LKM Section: Complete Re-building of bridge no. 218 at k.m. 122/5-6 in between station NOT-LKM by 1x4.0 meter span R.C.C box culvert (25 M.Ton axle load modified broad gauge loading capacity) in place of 1x12 feet span R.C.C slab bridge on main line with other allied works as per drawing.