Installation of Permanent Cathodic Protection System for Bogura-Rangpur-Saidpur (30" OD, 150 Km long) High-Pressure Gas Transmission Pipeline.
[CP System Detail Design, Engineering & Drawing; Soil Resistivity Survey & Additional Data Collection; Installation of CP Station (Vertical Ground Bed & TEG Shed and Platform), Condensate Trap & Gas Supply Line; Surge Diverter, Anode Junction Box, Negative Distribution Box, Test Post Facilities, Magnesium Anode for Casing Pipe, Zinc Anode and Zinc Ribbon Installation; Installation of 4-wire line current measurement; Installation of Remote Monitoring unit at CP station & Mid Point Test Post Facilities; Commissioning of CP System ].