a. The tenderer must submit up to date authorization letter for submission against this tender ID. b. If the quoted rate of any item deviates more than five percent (5%) compared to the RHD Rate Schedule 2022, then the tenderer must enclose rate analysis following RHD standard format in support of the quoted rate of that item with the tender. c. All bituminous works under this tender should be done with bitumen of penetration grade 60/70, and defect liability period will be 36 months. d. Tenderer should mention the full name of his/her firm (No abbreviation is allowed). In case of JV, All the partners should have the experience of similar nature of work individually. e. Asphalt Batching Plant and Concrete Batching Plant must be used in this work. Tenderer must submit relevant document in favor of ownership of his/her own Asphalt Batching Plant and Concrete Batching Plant If he/she does not own Asphalt Batching Plant and Concrete Batching Plant, then he/she must submit the Contract Agreement for acquisition of Asphalt Batching Plant and Concrete Batching Plant. The tenderer must provide the authorization of delivering the Asphalt Batching Plant and Concrete Batching Plant in site in due time.
f. If any same certificate found in twice or more in the scrutining of the tender evaluation process, the tenderer will be considered as non-responsive.
Note: All other information are available in TDS
Construction of Rigid pavement, Flexible Pavement, Strengthening, Surfacing , U drain ,CC Block with Geo-Textile & 2Nos 6.0m RCC Box Culvert at Ch. 29+395,Ch. 107+490, Flexible Pavement Ch:72+651 to 73+159 km, Ch. 86+200 to 86+700 (Latra Bypass) Ch: 93+844 to Ch: 94+344 km , Rigid pavement Ch.17+050 (Link) , Ch: 95+344 to 96+144Km , U drain Ch. 84+150 to 84+550 , Ch.95+344 to 96+144 & CC Block with Geo-Textile Ch:107+485 To 107+785 Km of Bhola (Porantalukderhat)-Borhanuddin-Lalmohon-Charfassion-Charmanika Regional Highway (R 890) under Bhola Road Division during the Year 2022-2023