As per TDS
Survey Work for Re-Excavation of River/khal/Irrigation Channel; Resectioning of embankment and Design Data Preparation at Different Location under Jhalakathi WD Division, BWDB, Jhalakathi from NDR budget during the FY 2022-2023.