View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | TDS correction. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 16/04/2023 15:00 | 26/04/2023 15:00 |
| Eligibility of Consultant | As per Tender Document. |
As per Tender Document. |
| Opening Date & Time | 17/04/2023 14:05 | 27/04/2023 14:05 |
| Meeting End Date & Time | 10/04/2023 15:00 | 18/04/2023 15:00 |
| Last date & time for Tender/Proposal Security Submission | 17/04/2023 13:10 | 27/04/2023 13:10 |
| Closing Date & Time | 17/04/2023 14:05 | 27/04/2023 14:05 |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 16,000,000 over the last 5 (Five) years.
The minimum amount of liquid assets or working capital or unconditional Credit Line or credit facilities of the Tenderer shall be Tk 5,000,000 |
The required average annual construction turnover shall be greater than Tk 15,500,000 over the last 5 (Five) years.
The minimum amount of liquid assets or working capital or unconditional Credit Line or credit facilities of the Tenderer shall be Tk 5,000,000 |
| TDS/PDS--E. Tender e-Submission-- |
The deadline for lodgement of e-Tenders is 17 April, 2023; 2:05 pm |
The deadline for lodgement of e-Tenders is 27 April, 2023; 2:05 pm |
| Brief Description of Goods,Works or Service | LGCRRP/Hathazari/2022-2023/W-01
(1) Rehabilitation of Buzruc Ali Chowdhury Road (ch. 00-345 m) with bituminous dense carpeting (BC) including overlay and hard shoulder surface wearing course under LGCRRP. (2) Construction of Drain (ch. 295-315m) beside Buzruc Ali Chowdhury Road under LGCRRP. (3) Development of Toybia Girls Academy Road (ch. 240-430 m) with Bituminous dense carpeting under LGCRRP. (4) Construction of drain (ch. 240-300 m) beside Toybia Girl's Academy Road under LGCRRP. (5) Development of Alampur Ashrayan Project Road (ch. 00-650 m) with HBB under LGCRRP. [Total Road Length= 1185 m; Total Drain Length= 80 m] |
LGCRRP/Hathazari/2022-2023/W-01
(1) Rehabilitation of Buzruc Ali Chowdhury Road (ch. 00-345 m) with bituminous dense carpeting (BC) including overlay and hard shoulder surface wearing course under LGCRRP. (2) Construction of Drain (ch. 295-315m) beside Buzruc Ali Chowdhury Road under LGCRRP. (3) Development of Toybia Girls Academy Road (ch. 240-430 m) with Bituminous dense carpeting under LGCRRP. (4) Construction of drain (ch. 240-300 m) beside Toybia Girl's Academy Road under LGCRRP. (5) Development of Alampur Ashrayan Project Road (ch. 00-650 m) with HBB under LGCRRP. [Total Road Length= 1185 m; Total Drain Length= 80 m] |