1. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 years counting backward from the date of publication of IFT in the newspaper.
2. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of maximum 02 (Two) contracts of Similar nature, complexity and methods/construction technology (Road Work, Abutment Work, Gangway Work, Pontoon Work, Spud Work: combination of all work under 2 contracts or Gangway & Pontoon work under 1 contract and Road Work, Abutment Work & Spud Work under 1 contract/Road, Bridge with Pile Work under 1 contract) within the last 05 years, value of at least Tk. 8.00 Crore.
3. The required average annual construction turnover shall be greater than Tk 20 (Twenty) Crore over the best three (3) years in the last five (5) years
4. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 10.00 (Ten) Crore
Construction, setting and operationalize of 6 nos Marine Fisheries Surveillance Checkposts Pontoon (with Gangway, Access Road) At Different Locations of Bangladesh –
1. DFTC Teknaf Cox’s Bazar 2. KV Ghat Sadar, Bagerhat 3. Motirhat, Kamalnagar, Laxmipur 4. Amtoli, Sukchar, Jahajghat, Hatiya, Noakhali 5. Charfassion, Bhola 6. Patenga, Chattogram