View IFT /PQ / REOI / RFP / PPS Notice Details
Amendment / Corrigendum Detail
|
Amendment / Corrigendum No. : 1
|
| Amendment / Corrigendum Text : |
Amendment of TDS |
| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
AS PER TDS
|
AS PER TDS
|
| PCC--.--
|
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section.
Both side four color cover printing shall be done for all textbook.
All four color books of Ibtedaye level contents page will be 80 GSM and All four color books of Class-6 contents page will be 70 GSM and all single color books of class-6 contents page will be 60 GSM as specified in technical specification [section 7]
Within first 45 days of the total contract days supplier must deliver 50% of the total deliverable of the contract products and the rest 50% of the contract products shall be delivered with in next 25 days.
If supplier fails to deliver first 50% within specified scheduled time, it will be treated as undelivered goods and Liquidated Damages will be applicable. In such case PE has the right to terminate the contract.
If a supplier is awarded for multiple tenders, supplier must comply each tender delivery schedule individually. If supplies daily production is not satisfactory within the contract period. PE has the right to terminate the contract immediately. For this type of non-performing activity PE has the right to forfeit the PG
Both Content Paper (60 GSM/70 GSM/80 GSM) and Art Card (230 GSM) will be supplied by the Supplier
The Suppliers must supply 5 set textbooks in the case of Bangla Version and 20 set textbooks in the case of English version i each lot at the distribution wing of NCTB as soon as completing the supply of textbooks with given destination of the tender.
|
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section.
Both side four color cover printing shall be done for all textbook.
All four color books of Ibtedaye level contents page will be 80 GSM and All four color books of Class-6 contents page will be 70 GSM and all single color books of class-6 contents page will be 60 GSM as specified in technical specification [section 7]
Within first 45 days of the total contract days supplier must deliver 50% of the total deliverable of the contract products and the rest 50% of the contract products shall be delivered with in next 25 days.
If supplier fails to deliver first 50% within specified scheduled time, it will be treated as undelivered goods and Liquidated Damages will be applicable. In such case PE has the right to terminate the contract.
If a supplier is awarded for multiple tenders, supplier must comply each tender delivery schedule individually. If supplies daily production is not satisfactory within the contract period. PE has the right to terminate the contract immediately. For this type of non-performing activity PE has the right to forfeit the PG
Both Content Paper (60 GSM/70 GSM/80 GSM) and Art Card (230 GSM) will be supplied by the Supplier.
Whatever is in the drawing section tenderer must be followed delivery schedule link
https://drive.google.com/file/d/1gu9glMyOqP3KkZSKtEpeaHMzCGiNL1hG/view?usp=share_link
|
| Brief Description of Goods,Works or Service
|
For Printing (with paper), Binding and Supplying of textbooks of Ebtadie 1,4 & 5, Secondary & Dakhil- class 6 and Technical (Trade Books)-class-6 to be distributed for the Academic Year 2024
|
For Printing (with paper), Binding and Supplying of textbooks of Ebtadie 1,4 & 5, Secondary & Dakhil- class 6 and Technical (Trade Books)-class-6 to be distributed for the Academic Year 2024
|
| Amendment / Corrigendum/ Addendum No. : |
1 |
| S. No. |
File Name |
File Description |
File Size
(in KB) |
| 1 |
L-38 - Delivery Schedule of Tender ID - 813495-.pdf |
Delivery Schedule |
91574 |