Ps Per TDS and PCC Attention: • Any obscure documents submitted by the contractor will be considered unacceptable. • Turnover calculation only payment certificate will be acceptable. • Completed certificates will not be accepted as turnover. • The completion certificate has to be submitted in the prescribed PWD format Otherwise not acceptable • The contractor will be deemed to be directly disqualified if any false Information. The required average annual construction turnover shall be greater than Tk 85.00 lakh (Total Amounting Tk. 85.00 X5 = 425.00 Lakh) over the last 5( Five) years, counting backward from the date of publication of IFT in the newspaper.
A satisfactory completion of similar works of at least Tk 60.00 Lakh under of of Contract(s) over a period of last 05 years shall be required.
The Tender shall have minimum amount of liquid assets of TK. 25.00 lac. (Letter of Commitment for Bank’s Undertaking for line of Credit Not before 09.04.2023).
* Contractors with 0% work progress cannot participate in the Tender.
Vertical Extension of Existing Academic Building (3rd Floor) including Sanitary Water Supply & Electrification Works of Mathavanga Mohila Alim Madrasha Gazaria Upazila Munshiganj District