View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Agriculture Division :
Organization : Bangladesh Agricultural Development Corporation (BADC) Procuring Entity Name : PD Office of Renovation, Modernization & Construction of Office Buildings & Infrastructures of BADC.
Procuring Entity Code : Procuring Entity District : Dhaka
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : RMCIP- W63 Tender/Proposal Status :
App ID : 186329 Tender/Proposal ID : 818048
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 224242400 Project Name : Project for Renovation, Modernization & Construction of Office Buildings & Infrastructures of Bangladesh Agricultural Development Corporation (BADC)
Tender/Proposal Package No. and Description : RMCIP- W3
Renovation of Office Buildings & Infrastructures under project for Renovation Modernization & Construction of Office Buildings & Infrastructures of BADC Ref-3
Category : Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
Scheduled Tender/Proposal Publication
Date and Time :
13-Apr-2023 10:43 Tender/Proposal Document last selling /
downloading Date and Time :
26-Apr-2023 14:00
Pre - Tender/Proposal meeting Start
Date and Time :
13-Apr-2023 11:26 Pre - Tender/Proposal meeting End
Date and Time :
18-Apr-2023 10:26
Tender/Proposal Closing
Date and Time :
27-Apr-2023 10:44 Tender/Proposal Opening
Date and Time :
27-Apr-2023 10:44
Last Date and Time for Tender/Proposal Security
Submission :
26-Apr-2023 17:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As TDS. Work order issue will be subject to the approval of RDPP & other appropriate authority & Bill payment will be made subject to availability/ allocation of budget and site..
The Contractor should take enough safety measures and bear all the responsibility regarding the safety of his workers and other people during the work time.
The quantity of work may be changed or become zero, and non-schedule item may be included according to the advise of Consultant and PD. The bidder should abide by such changes. Price of such item to fix as PWD rate schedule, Quoted rate and Market analysis.
 

Brief Description of Works :

Renovation of Office Buildings & Infrastructures under project for Renovation Modernization & Construction of Office Buildings & Infrastructures of BADC Ref-3

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 1000
Mode of Payment :
Tender/Proposal Security Valid Up to : 23-Aug-2023
Tender/Proposal Valid Up to : 26-Jul-2023
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 Renovation of Office Buildings & Infrastructures under project for Renovation Modernization & Construction of Office Buildings & Infrastructures of BADC Ref-3 Within RMCIP At Mymensingh Division 16000 10-May-2023 20-Dec-2023
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : A. K. M. JAHANGIR ALAM SARKER Designation of Official Inviting Tender/Proposal : Project Director
Address of Official Inviting Tender/Proposal :
Address: Level 2, Krishi Bhaban 49-51, Dilkusha Commercial Area Dhaka-1000
City: Dhaka
Thana: Motijheel
District: Dhaka - 1000
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 02-9552101
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

BOQ Modification

Field Name Old Value New Value
Eligibility of Consultant

As TDS. Work order issue will be subject to the approval of RDPP & other appropriate authority & Bill payment will be made subject to availability/ allocation of budget and site..
The Contractor should take enough safety measures and bear all the responsibility regarding the safety of his workers and other people during the work time.
The quantity of work may be changed or become zero, and non-schedule item may be included according to the advise of Consultant and PD. The bidder should abide by such changes. Price of such item to fix as PWD rate schedule, Quoted rate and Market analysis.
 

As TDS. Work order issue will be subject to the approval of RDPP & other appropriate authority & Bill payment will be made subject to availability/ allocation of budget and site..
The Contractor should take enough safety measures and bear all the responsibility regarding the safety of his workers and other people during the work time.
The quantity of work may be changed or become zero, and non-schedule item may be included according to the advise of Consultant and PD. The bidder should abide by such changes. Price of such item to fix as PWD rate schedule, Quoted rate and Market analysis.
 

PCC--A. General--

The Procuring Entity is
[Name, address]
 

The Procuring Entity is
Project Director,
Project for Renovation, Modernization and Construction of Office Buildings and Infrastructures of Bangladesh Agricultural Development Corporation (BADC)
BADC, KrishiBhaban, 49-51, Dilkhusa C/A, Dhaka

 

PCC--A. General--

The Project Manager is
[Name, address]
 

The Project Manager is
Respective Executive Engineer, BADC
 

PCC--A. General--

The Site is located at [location] and is defined in drawings No:
[insert numbers]
 

The Site is located at Sreebordi

PCC--A. General--

The Works consist of
[state brief summary]
 

The Works consist of
Renovation building
 

PCC--A. General--

Other documents forming part of the Contract are;

[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.]
 

Other documents forming part of the Contract are;NA

PCC--A. General--

Possession of the Site to the Contractor shall be given on the following date;

[state date of possession of site]
 

The Project Manager will give possession Within 7 days after contract signing and subjected to availability of Site

PCC--B. Time Control--

The Start Date shall be [insert date ]
[it is the last date when the Contractor shall commence execution of the Works under the Contract]
 

The Project Manager will give possession Within 7 days after contract signing and subjected to availability of Site

PCC--B. Time Control--

The Intended Completion Date for the whole of the Works shall be [insert date]
[to be calculated from the start Date]
 

The Intended Completion Date for the whole of the Works shall be 20.12.2023

PCC--B. Time Control--

The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract.
[usually ten (10) days or may be less]
 

The Contractor shall submit a Programme for the Works within ten (10) days of signing the Contract.

 

PCC--C. Quality Control--

The Defects Liability Period is [state months]
[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

The Defects Liability Period is twelve (12) months

PCC--C. Quality Control--

The Defects Liability Period is [state months]
[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

The Defects Liability Period is twelve (12) months

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:
[list events or state none ]
 

The following additional events shall also be the Compensation Events:
NA
 

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.

The proportion of payments to be retained is 10 percent.

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

The amount of Liquidated Damages or in other words Delay Damages is0.05 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

The amount of Liquidated Damages or in other words Delay Damages is0.05 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

PCC--D. Cost Control--

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.
[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]
 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is ten (10) percent of the final Contract price of the whole of the Works.

PCC--F. Termination--

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is [state percentage] percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is ten (10) percent.

PCC--H. Disputes and Settlement--

The arbitration shall be conducted in the place mentioned below;
[state name of place with location and district ]
 

The arbitration shall be conducted in the place mentioned below;
Office of the Chief Engineer (Construction Division), BADC, KrishiBhaban, Dhaka

 

TDS/PDS--A. General--

 

The PE is [state name of PE]

 

 

 

The Name of the Tender is:
Brief Description of the Works:

Tender Ref:
Lot No(s):

[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities]
 

 

The PE is A.K.M Jahangir Alam Sarker

 

 

 

The Name of the Tender is: Renovation of Office Buildings & Infrastructures under project for Renovation Modernization & Construction of Office Buildings & Infrastructures of BADC Ref-3
Brief Description of the Works: Renovation of Office Buildings & Infrastructures under project for Renovation Modernization & Construction of Office Buildings & Infrastructures of BADC Ref-3

Tender Ref: W-3
Lot No(s):1

TDS/PDS--B. Tender Document--

Allowed to post clarification till [Date and Time]

Allowed to post clarification till : NA

TDS/PDS--C. Qualification Criteria--

The minimum amount of liquid assets or working capital or credit facilities of the  Tenderer shall be Tk [state amount]

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:
Contract Value:   Tk 24 lakh
Contract period:   12 months
Assuming work time:  1 month
Invoice period:    0.5 month
Certification Time:   0.5 month
Contingency Time:   1 month

Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 6.00 Lac. In case of bank statement, the time duration should be minimum two months and should be issued within 1 week of closing date. 

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be:[70%-80% of the official estimated cost]
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
 

The minimum capacity shall be:Tk 5.5Lac

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be:[70%-80% of the official estimated cost]
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
 

The minimum capacity shall be:Tk 5.5Lac

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.

[ the required average annual construction  turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be  best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)]
Example:
Estimated Contract Value:  Tk 24 lakh
Contract period:   12 months
Estimated Annual Cash Flow:  Tk 24 lakh
Required average annual construction turn over: Tk 12 lakh, using a multiplier of 0.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The required average annual construction turnover shall be greater than Tk 8.0 Lac over the last 3 years.
[ years counting backward from the date of publication of IFT in the newspaper. ]
 

TDS/PDS--C. Qualification Criteria--

A satisfactory completion of similar works of at least Tk [insert amount] under [state number] of contract(s) over a period of [state number] years shall be required.

[the minimum value of the similar works under a single or multiple number of  contract(s) is recommended to be between 50  and 75 percent of the estimated cost, rounded off to nearest Taka  thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper]

[for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package]
 

A satisfactory completion of similar works using public fund of at least Tk 5.5 Lac under a single contract over a period of 3 years shall be required.
[ years counting backward from the date of publication of IFT in the newspaper.]
 

TDS/PDS--D. Tender Preparation--

Tenderer shall submit with its Tender, the following additional documents:

Tenderer shall submit with its Tender, the following additional documents: NA

TDS/PDS--D. Tender Preparation--

The Tender Validity period shall be [state number] days.

[normally 60 to 90 days deemed reasonable]
 

The Tender Validity period shall be 90 days

TDS/PDS--D. Tender Preparation--

The Tender Validity period shall be [state number] days.

[normally 60 to 90 days deemed reasonable]
 

The Tender Validity period shall be 90 days

TDS/PDS--D. Tender Preparation--

The amount of the Tender Security shall be [ state amount ]
[note: Not exceeding three percent (3%) of the official estimated cost but as a fixed amount] 

 

The amount of the Tender Security shall be: as tender notice

TDS/PDS--E. e-Tender Submission--

The deadline for lodgment of e-Tenders is [state time, and identify AM or PM e.g 10.30 a.m]
[state date, e.g 15 June,2011  ].
 

The deadline for lodgment of e-Tenders is: as tender notice

Brief Description of Goods,Works or Service

Renovation of Office Buildings & Infrastructures under project for Renovation Modernization & Construction of Office Buildings & Infrastructures of BADC Ref-3

Renovation of Office Buildings & Infrastructures under project for Renovation Modernization & Construction of Office Buildings & Infrastructures of BADC Ref-3

 