"01.A satisfactory completion of similar works of at least Tk 8.62(Eight Point Six Two)Lac under one (single) contract over a period of last 5 (Five) years will be required. 02. Work order will be issued on the basis of sanction estimate, budgetary provision and after getting clearance from the competent authority thereof for which no claim will be accepted. 03. The work may be totally dropped, decreased or increased. No extra claim will be entertained for cancellation of the tender or issuance of work order with decreased or increased quantity of the work. 04. Bill Payment will be made subject to the availability of fund. No extra claim or extra payment will be entertained for delay of payment. 05. All required documents should be clear scan copy of the originals otherwise that document won’t be accepted."
Manufacturing, Supplying & Installation of 02 Nos 1.05m X 1.05m M.S Flap gate at Bashukhali Pipe Sluice of Polder: 4 and 04 Nos 1.65mX1.875m M.S Lift gate & 04 Nos Pasestal type lifting device at S-4 (Krishna Nagor), DS-Bamnali Sluice of Kolaroua Drainage Project with all accessories for Satkhira O&M Division-2 under Khulna Mechanical Division, BWDB, Khulna During the year 2022-23.