1. A Programme must be submitted for this Supply Activity within 07 days through Engineer-Incharge to PE after signing of the Contract.
2. As per work schedule, after execution of Supply Activity, Measurement Certificate should be prepared by the Engineer-Incharge & the Contractor. 3. Before submitting the tender, the tenderer must submit a Consent Letter so that the tenderer is aware of this. Failure to submit the consent letter will disqualify the tenderer. 4.Any type of supply experience BDT 6 Lac under 2 of contract(s) over a period of 5 years shall be required..
5.. Valid Trade License, Up-to-Date Income Tax Certificate, TIN, VAT certificate.
Supply, installation, testing and commissioning of 02 Nos Split Type Air Cooler for Siddhirganj Grid Substations under GMD, Dhaka (East), PGCB