View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Change is made in the GCC Clause 32. Inspections and Tests (Only the Pre-delivery Inspection) |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 25/06/2023 10:00 | 03/07/2023 10:00 |
| Opening Date & Time | 25/06/2023 12:00 | 03/07/2023 12:00 |
| PCC--.-- | 1. Submission & Approval of Design, Drawing, Specification & GTP/Engineering Data: Design, Drawing, Specification & GTP/ Engineering Data etc, shall be submitted to the Superintending Engineer, Design & Inspection, Bidyut Bhaban, Hetem Khan, Rajshahi by the Supplier for approval, prior to the manufacturing of the goods. The Supplier shall have to submit 3 (three) sets of the same for approval within 15 (fifteen) days from the date of signing Contract. Only Original copy shall be submitted (photocopy / scanned copy will not be allowed). One copy of Design, Drawing, Specification & GTP/ Engineering Data shall be returned to the Supplier marked “APPROVED” or “APPROVED AS NOTED” or “RETURNED FOR CORRECTION” within 14 (Fourteen) days after receipt from the Supplier and if not returned within 14 (Fourteen) days after receipt by the Engineer, the Suppliers shall notify Engineer of such fact, and if the Design, Drawing, Specification & GTP/ Engineering Data still have been not returned within 7(Seven) days after notice, the Supplier may proceed as if Design, Drawing, Specification & GTP/ Engineering Data have been returned approved. When the Design, Drawing, Specification & GTP/ Engineering Data are returned marked “APPROVED AS NOTED” or “RETURNED FOR CORRECTION” the corrections or changes shall be made and 3 (three) revised copies shall be submitted to the Engineer. One copy of the revised Design, Drawing, Specification & GTP/ Engineering Data will be returned to the Supplier by 7(Seven) days from the receipt of the same with due approval, if re-submitted Design, Drawing, Specification & GTP/ Engineering Data are in line with the earlier comments of the Engineer and satisfy contract specification . 2. The inspections and tests shall be: Pre-delivery inspection :
Witnessing of the manufacturing process and tests of the offered equipment at manufacturer’s works including transfer of technical know-how. For foreign manufacturer, Invitation letter from the manufacturer should be submitted to the purchaser at least 02 (Two) months prior to the schedule date of the witness and tests and supplier shall bear the cost of tests along with the round air tickets, hotel accommodations, per diem allowances, internal transportations and out of pocket expenses @ US$ 200.00 per person per day for 7 days (including travel time) for three (03) Nos NESCO Engineers for the witnessing of manufacturing process and tests of concerned conductors at manufacturer’s works. 3. POST LANDING INSPECTION: (a) Post Landing Inspection shall be done after arrival of the goods at Purchaser Store. The Post Landing Inspection shall be conducted by NESCO’s representatives in presence of supplier. R&I report will be issued after successful Post Landing Inspection. (b) The Purchaser has right to inspect, test and where necessary, reject the Goods arrival in the purchaser’s store shall in no way be limited or waived by reason of the Goods having previously been tested and passed by the manufacturer/supplier.
Supplier shall bear the cost of all tests, transportation, loading and unloading, round air tickets for the inspection team. |
1. Submission & Approval of Design, Drawing, Specification & GTP/Engineering Data: Design, Drawing, Specification & GTP/ Engineering Data etc, shall be submitted to the Superintending Engineer, Design & Inspection, Bidyut Bhaban, Hetem Khan, Rajshahi by the Supplier for approval, prior to the manufacturing of the goods. The Supplier shall have to submit 3 (three) sets of the same for approval within 15 (fifteen) days from the date of signing Contract. Only Original copy shall be submitted (photocopy / scanned copy will not be allowed). One copy of Design, Drawing, Specification & GTP/ Engineering Data shall be returned to the Supplier marked “APPROVED” or “APPROVED AS NOTED” or “RETURNED FOR CORRECTION” within 14 (Fourteen) days after receipt from the Supplier and if not returned within 14 (Fourteen) days after receipt by the Engineer, the Suppliers shall notify Engineer of such fact, and if the Design, Drawing, Specification & GTP/ Engineering Data still have been not returned within 7(Seven) days after notice, the Supplier may proceed as if Design, Drawing, Specification & GTP/ Engineering Data have been returned approved. When the Design, Drawing, Specification & GTP/ Engineering Data are returned marked “APPROVED AS NOTED” or “RETURNED FOR CORRECTION” the corrections or changes shall be made and 3 (three) revised copies shall be submitted to the Engineer. One copy of the revised Design, Drawing, Specification & GTP/ Engineering Data will be returned to the Supplier by 7(Seven) days from the receipt of the same with due approval, if re-submitted Design, Drawing, Specification & GTP/ Engineering Data are in line with the earlier comments of the Engineer and satisfy contract specification . 2. The inspections and tests shall be: Pre-delivery inspection : Pre-delivery inspection will be held at Tenderer's premises by NESCO engineers. Such witness/inspection shall not relieve the supplier from any obligation to supply the goods in accordance with contract document. 3. POST LANDING INSPECTION: (a) Post Landing Inspection shall be done after arrival of the goods at Purchaser Store. The Post Landing Inspection shall be conducted by NESCO’s representatives in presence of supplier. R&I report will be issued after successful Post Landing Inspection. (b) The Purchaser has right to inspect, test and where necessary, reject the Goods arrival in the purchaser’s store shall in no way be limited or waived by reason of the Goods having previously been tested and passed by the manufacturer/supplier.
Supplier shall bear the cost of all tests, transportation, loading and unloading, round air tickets for the inspection team. |
| Meeting End Date & Time | 11/06/2023 12:03 | 26/06/2023 12:03 |
| Last date & time for Tender/Proposal Security Submission | 25/06/2023 11:00 | 03/07/2023 11:00 |
| Closing Date & Time | 25/06/2023 12:00 | 03/07/2023 12:00 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | The meters need to comply the attached Specifications in addition to the existing requirements. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 18/06/2023 15:00 | 25/06/2023 10:00 |
| Eligibility of Consultant | As per tender document. |
As per tender document. |
| Opening Date & Time | 19/06/2023 12:00 | 25/06/2023 12:00 |
| Last date & time for Tender/Proposal Security Submission | 19/06/2023 11:00 | 25/06/2023 11:00 |
| Closing Date & Time | 19/06/2023 12:00 | 25/06/2023 12:00 |
| Brief Description of Goods,Works or Service | Procurement of Smart Pre-payment Meter for Sales & Distribution Division- 2, NESCO PLC, Bogura. |
Procurement of Smart Pre-payment Meter for Sales & Distribution Division- 2, NESCO PLC, Bogura. |
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Smart Meter Specs.pdf | Specifications | 886892 | ||