View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Housing and Public Works Division :
Organization : Public Works Department (PWD) Procuring Entity Name : Dhaka PWD Division-3, Dhaka
Procuring Entity Code : Procuring Entity District : Dhaka
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : ACE Dhaka Metro zone Memo 25.36.2600.001.20.901 Tender/Proposal Status :
App ID : 193930 Tender/Proposal ID : 843400
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : drug /8523 Project Name : Expansion and Modernization of Dhaka Central Drug Addiction Treatment Center
Tender/Proposal Package No. and Description : Dhk3/DevNarcotics/WD2
Expansion and modernization of Dhaka Central Drug Addiction Treatment Center (Sub Head: Drug de-addiction and and Training centre â??Construction of 13 storied building with 1 basement)
Category : Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
Scheduled Tender/Proposal Publication
Date and Time :
07-Jun-2023 23:40 Tender/Proposal Document last selling /
downloading Date and Time :
09-Jul-2023 17:00
Pre - Tender/Proposal meeting Start
Date and Time :
08-Jun-2023 10:30 Pre - Tender/Proposal meeting End
Date and Time :
08-Jun-2023 12:30
Tender/Proposal Closing
Date and Time :
10-Jul-2023 15:50 Tender/Proposal Opening
Date and Time :
10-Jul-2023 15:50
Last Date and Time for Tender/Proposal Security
Submission :
10-Jul-2023 11:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

Reputed Contractor/Construction firms who have minimum 10 (Ten)years of general experience in construction work. Having experience as a Prime Contractor or Subcontractor or Management Contractor in successful completion of at least 01( One) single basement 10 storied RCC building Construction during last 5 (Five) years in any Government/ Semi Government/ Autonomous Organization of Bangladesh with a value of at least Tk. 60,00,00,000.00 ( Six thousand lacs) Only. In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. In case of the work done under any Government/ Semi Government/ Autonomous Organization other than PWD, the certifying authority shall be an officer not below the rank of Executive Engineer and same duly verified by the concerned Executive Engineer of PWD of that district under whose jurisdiction the work has been done. Annual Average Construction Turnover Tk 60,00,00,000.00 ( Six thousand Lacs) during last 05( Five) years. Payment certificates for Contracts in progress or completed under public sector must be submitted along with tender in support of Annual Average Construction Turnover The Tenderer must have a minimum amount of Liquid Asset /Credit Facilities Tk 12,00,00,000.00 (One thousand Two hundred Lacs) only. Lac. Document of Liquid Assets submitted along with the tender must be issued in between publication date and submission date of the tender. Certificate of unconditional Liquid Asset must be in the form of letter of commitment of Bank for line of credit to the Tenderer in favor of the work in the form PW3-7, otherwise the tender will be summarily rejected.The minimum Tender Capacity shall be Tk 70,00,00,000.00(Seven Thousand lacs) only

Brief Description of Works :

Expansion and modernization of Dhaka Central Drug Addiction Treatment Center (Sub Head: Drug de-addiction and and Training centre –Construction of 13 storied building with 1 basement).

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 4000
Mode of Payment :
Tender/Proposal Security Valid Up to : 03-Feb-2024
Tender/Proposal Valid Up to : 06-Jan-2024
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 Expansion and modernization of Dhaka Central Drug Addiction Treatment Center (Sub Head: Drug de-addiction and and Training centre â??Construction of 13 storied building with 1 basement) Dhaka 24000000 05-Nov-2023 04-Nov-2025
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Md. Kaysar Ibne Saikh Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: Dhaka PWD Division-3, Dhaka
City: Dhaka
Thana: Ramna
District: Dhaka - 1000
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 02-9561359
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

 Having experience as a Prime Contractor or Subcontractor or Management Contractor in successful completion of at least 01( One) single basement 10 storied RCC building Construction during last 5 (Five) years in any Government/ Semi Government/ Autonomous Organization of Bangladesh with a value of at least Tk. 60,00,00,000.00 ( Six thousand lacs) Only. Annual Average Construction Turnover Tk 60,00,00,000.00 ( Six thousand Lacs) during last 05( Five) years.The Tenderer must have a minimum amount of Liquid Asset /Credit Facilities Tk 12,00,00,000.00 (One thousand Two hundred Lacs) only.  

Field Name Old Value New Value
Completion Date(Lot No : 1) 30/10/2025 04/11/2025
Document last selling date & time 06/07/2023 11:00 09/07/2023 17:00
Eligibility of Consultant

Reputed Contractor/Construction firms who have minimum 10 (Ten)years of general experience in construction work. Having experience as a Prime Contractor or Subcontractor or Management Contractor in successful completion of at least 01( One) single basement 10 storied RCC building Construction during last 5 (Five) years in any Government/ Semi Government/ Autonomous Organization of Bangladesh with a value of at least Tk. 60,00,00,000.00 ( Sixty thousand lacs) Only. In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. In case of the work done under any Government/ Semi Government/ Autonomous Organization other than PWD, the certifying authority shall be an officer not below the rank of Executive Engineer and same duly verified by the concerned Executive Engineer of PWD of that district under whose jurisdiction the work has been done. Annual Average Construction Turnover Tk 60,00,00,000.00 ( Sixty thousand Lacs) during last 05( Five) years. Payment certificates for Contracts in progress or completed under public sector must be submitted along with tender in support of Annual Average Construction Turnover The Tenderer must have a minimum amount of Liquid Asset /Credit Facilities Tk 12,00,00,000.00 (One thousand Two Lacs) only. Lac. Document of Liquid Assets submitted along with the tender must be issued in between publication date and submission date of the tender. Certificate of unconditional Liquid Asset must be in the form of letter of commitment of Bank for line of credit to the Tenderer in favor of the work in the form PW3-7, otherwise the tender will be summarily rejected.The minimum Tender Capacity shall be Tk 7,00,00,000.00(Seven Thousand lacs) only

Reputed Contractor/Construction firms who have minimum 10 (Ten)years of general experience in construction work. Having experience as a Prime Contractor or Subcontractor or Management Contractor in successful completion of at least 01( One) single basement 10 storied RCC building Construction during last 5 (Five) years in any Government/ Semi Government/ Autonomous Organization of Bangladesh with a value of at least Tk. 60,00,00,000.00 ( Six thousand lacs) Only. In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. In case of the work done under any Government/ Semi Government/ Autonomous Organization other than PWD, the certifying authority shall be an officer not below the rank of Executive Engineer and same duly verified by the concerned Executive Engineer of PWD of that district under whose jurisdiction the work has been done. Annual Average Construction Turnover Tk 60,00,00,000.00 ( Six thousand Lacs) during last 05( Five) years. Payment certificates for Contracts in progress or completed under public sector must be submitted along with tender in support of Annual Average Construction Turnover The Tenderer must have a minimum amount of Liquid Asset /Credit Facilities Tk 12,00,00,000.00 (One thousand Two hundred Lacs) only. Lac. Document of Liquid Assets submitted along with the tender must be issued in between publication date and submission date of the tender. Certificate of unconditional Liquid Asset must be in the form of letter of commitment of Bank for line of credit to the Tenderer in favor of the work in the form PW3-7, otherwise the tender will be summarily rejected.The minimum Tender Capacity shall be Tk 70,00,00,000.00(Seven Thousand lacs) only

Opening Date & Time 06/07/2023 15:30 10/07/2023 15:50
Last date & time for Tender/Proposal Security Submission 06/07/2023 13:00 10/07/2023 11:00
Start Date(Lot No : 1) 01/11/2023 05/11/2023
Closing Date & Time 06/07/2023 15:30 10/07/2023 15:50
TDS/PDS--C. Qualification Criteria--

The minimum number of years of general experience of the Tenderer :Reputed Contractor/Construction firms who have minimum 10 (Ten)years of general experience in construction work.

 

The minimum specific experience:  Having experience as a Prime Contractor or Subcontractor or Management Contractor in successful completion of at least 01( One) single basement 10 storied RCC building Construction during last 5 (Five) years in any Government/ Semi Government/ Autonomous Organization of Bangladesh with a value of at least Tk. 60,00,00,000.00 ( Sixty thousand lacs) Only. In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. In case of the work done under any Government/ Semi Government/ Autonomous Organization other than PWD, the certifying authority shall be an officer not below the rank of Executive Engineer and same duly verified by the concerned Executive Engineer of PWD of that district under whose jurisdiction the work has been done.

[

The minimum number of years of general experience of the Tenderer :Reputed Contractor/Construction firms who have minimum 10 (Ten)years of general experience in construction work.

 

The minimum specific experience:  Having experience as a Prime Contractor or Subcontractor or Management Contractor in successful completion of at least 01( One) single basement 10 storied RCC building Construction during last 5 (Five) years in any Government/ Semi Government/ Autonomous Organization of Bangladesh with a value of at least Tk. 60,00,00,000.00 ( Six thousand lacs) Only. In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. In case of the work done under any Government/ Semi Government/ Autonomous Organization other than PWD, the certifying authority shall be an officer not below the rank of Executive Engineer and same duly verified by the concerned Executive Engineer of PWD of that district under whose jurisdiction the work has been done.

[

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover Annual Average Construction Turnover Tk 60,00,00,000.00 ( Sixty thousand Lacs) during last 05( Five) years. Payment certificates for Contracts in progress or completed under public sector must be submitted along with tender in support of Annual Average Construction Turnover

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

  

The Tenderer must have a minimum amount of Liquid Asset /Credit Facilities Tk 12,00,00,000.00 (One thousand Two Lacs) only. Lac. Document of Liquid Assets submitted along with the tender must be issued in between publication date and submission date of the tender. Certificate of unconditional Liquid Asset must be in the form of letter of commitment of Bank for line of credit to the Tenderer in favor of the work in the form PW3-7, otherwise the tender will be summarily rejected.

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:


Contract Value: Tk 24 Cr.
Contract period: 18 months
Assuming work time: 1 month
Invoice period: 0.5 month
Certification Time: 0.5 month
Contingency Time: 1 month

Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

 

The required average annual construction turnover Annual Average Construction Turnover Tk 60,00,00,000.00 ( Six thousand Lacs) during last 05( Five) years. Payment certificates for Contracts in progress or completed under public sector must be submitted along with tender in support of Annual Average Construction Turnover

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

  

The Tenderer must have a minimum amount of Liquid Asset /Credit Facilities Tk 12,00,00,000.00 (One thousand Two hundred Lacs) only. Lac. Document of Liquid Assets submitted along with the tender must be issued in between publication date and submission date of the tender. Certificate of unconditional Liquid Asset must be in the form of letter of commitment of Bank for line of credit to the Tenderer in favor of the work in the form PW3-7, otherwise the tender will be summarily rejected.

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:


Contract Value: Tk 24 Cr.
Contract period: 18 months
Assuming work time: 1 month
Invoice period: 0.5 month
Certification Time: 0.5 month
Contingency Time: 1 month

Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

 

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be Tk 7,00,00,000.00(Seven Thousand lacs) only.
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.
 

The minimum capacity shall be Tk 70,00,00,000.00(Seven Thousand lacs) only.
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.
 

Brief Description of Goods,Works or Service

Expansion and modernization of Dhaka Central Drug Addiction Treatment Center (Sub Head: Drug de-addiction and and Training centre –Construction of 13 storied building with 1 basement).

Expansion and modernization of Dhaka Central Drug Addiction Treatment Center (Sub Head: Drug de-addiction and and Training centre –Construction of 13 storied building with 1 basement).

 