View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum issued as per changes in BoQ and reuired documents have been uploaded. |
| Field Name | Old Value | New Value | |||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Document last selling date & time | 03/07/2023 15:58 | 10/07/2023 15:00 | |||||||||||||||||||||||||||||||||||||||||||||
| Eligibility of Consultant | As mentioned in TDS. |
As mentioned in TDS. |
|||||||||||||||||||||||||||||||||||||||||||||
| Opening Date & Time | 04/07/2023 12:16 | 11/07/2023 14:00 | |||||||||||||||||||||||||||||||||||||||||||||
| PCC 1. Definitions(kk)Site |
|
|
|||||||||||||||||||||||||||||||||||||||||||||
| PCC 6. Documents Forming the Contract and Priority of Documentsj.Documents |
|
|
|||||||||||||||||||||||||||||||||||||||||||||
| Last date & time for Tender/Proposal Security Submission | 03/07/2023 18:46 | 10/07/2023 18:30 | |||||||||||||||||||||||||||||||||||||||||||||
| Closing Date & Time | 04/07/2023 12:16 | 11/07/2023 14:00 | |||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 (Three) years. [years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01(one) contract(s) of similar nature, complexity and methods/construction technology, described below, successfully completed within the last 03 (Three) years, with a value of at least Tk. 4,75,00,000.
Construction of drain, syphon, r.c.c. or masonry water conveyance structures, cement concrete lining of canal. |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 (Three) years. [years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01(one) contract(s) of similar nature, complexity and methods/construction technology, described below, successfully completed within the last 03 (Three) years, with a value of at least Tk. 4,75,00,000.
Construction of field channel/ drain, syphon, r.c.c. or masonry water conveyance structures, cement concrete lining of canal. |
|||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
|||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | RMDIP/W-40/2022-23 |
RMDIP/W-40/2022-23 |
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Design of Field channel.pdf | Design | 450334 | ||
| 2 | Technical Specification BWDB for field channel.pdf | Technical Specification | 45826 | ||