View IFT /PQ / REOI / RFP / PPS Notice Details
Amendment / Corrigendum Detail
|
Amendment / Corrigendum No. : 3
|
| Amendment / Corrigendum Text : |
This Corrigendum has been issued due to unavoidable reasons. |
| Field Name |
Old Value |
New Value |
| Document last selling date & time
|
13/07/2023 17:00 |
19/07/2023 17:00 |
| Opening Date & Time
|
16/07/2023 12:00 |
20/07/2023 12:00 |
| Last date & time for Tender/Proposal Security Submission
|
10/07/2023 11:00 |
20/07/2023 11:00 |
| Closing Date & Time
|
16/07/2023 12:00 |
20/07/2023 12:00 |
|
Amendment / Corrigendum No. : 2
|
| Amendment / Corrigendum Text : |
This corrigendum has been given due to unavoidable reason. |
| Field Name |
Old Value |
New Value |
| Document last selling date & time
|
09/07/2023 17:00 |
13/07/2023 17:00 |
| Opening Date & Time
|
10/07/2023 12:00 |
16/07/2023 12:00 |
| Closing Date & Time
|
10/07/2023 12:00 |
16/07/2023 12:00 |
|
Amendment / Corrigendum No. : 1
|
| Amendment / Corrigendum Text : |
This Corrigendum has been issued due to avoidable reasons. |
| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
1) All tenderer must be registered in e-gp portal system.
2) Payment will be made upon availability of fund; no claim will be entertained.
3) It is the tenderer's responsibility to submit all documents in their original form. If any documents become corrupted and the evaluation team is unable to open the file, no claim will be considered.
4) VAT & IT from bill will be deducted as per prevailing Government Rate.
5) If any type of Structure/Obstrucle is needed to dismantle to execute the work as per Design & Specification, the tenderer will do this at his own expense. No extra claims will be considered.
6) The tenderer must follow the latest instructions and formats of CPTU.
7) If BWDB owned land is not sufficient to execute the work as per design & Specification, the bidder will do this at his own expense and planning.
8) It is mandatory to submit video and still photographs of the said work in pre-work and post work condition to PE at contractor's own cost.
9) Quantity of work may extremely change and Design may also be modified.
10) Cost of pre work, interim and post-work survey will be borne by the contractor.
11) The work must be executed as per approved design uploaded at Sec-9 & technical specifications of BWDB uploaded at Sec-7of tender document.
12) The approved taskforce guideline uploaded at Sec-8 will be followed.
|
1) All tenderer must be registered in e-gp portal system.
2) Payment will be made upon availability of fund; no claim will be entertained.
3) It is the tenderer's responsibility to submit all documents in their original form. If any documents become corrupted and the evaluation team is unable to open the file, no claim will be considered.
4) VAT & IT from bill will be deducted as per prevailing Government Rate.
5) If any type of Structure/Obstrucle is needed to dismantle to execute the work as per Design & Specification, the tenderer will do this at his own expense. No extra claims will be considered.
6) The tenderer must follow the latest instructions and formats of CPTU.
7) If BWDB owned land is not sufficient to execute the work as per design & Specification, the bidder will do this at his own expense and planning.
8) It is mandatory to submit video and still photographs of the said work in pre-work and post work condition to PE at contractor's own cost.
9) Quantity of work may extremely change and Design may also be modified.
10) Cost of pre work, interim and post-work survey will be borne by the contractor.
11) The work must be executed as per approved design uploaded at Sec-9 & technical specifications of BWDB uploaded at Sec-7of tender document.
12) The approved taskforce guideline uploaded at Sec-8 will be followed.
|
| Brief Description of Goods,Works or Service
|
River bank protective work from Km. 0.000 to km 0.350 = 350.00 meter & Km. 0.720 to km 0.885 = 165.00 meter Total 515.00 meter in Polder No-14/1 under "Rehabilitation of Polder No-14/1 in Khulna District" under Khulna O&M Division-2, BWDB, Khulna During the year 2022-2023.
|
River bank protective work from Km. 0.000 to km 0.350 = 350.00 meter & Km. 0.720 to km 0.885 = 165.00 meter Total 515.00 meter in Polder No-14/1 under "Rehabilitation of Polder No-14/1 in Khulna District" under Khulna O&M Division-2, BWDB, Khulna During the year 2022-2023.
|