As stated in tender document.
On main line in PHT- BKND station : Construction of bank protection wall at K.M. 5/3-5 (Up line) = 400 rft, K.M. 5/3-4 (Dn line) = 40 rft, Total = 440 rft near bridge no.10 including repairs to cess & bank as per approved drawing with other allied works.