View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Water Resources Division :
Organization : Bangladesh Water Development Board (BWDB) Procuring Entity Name : Satkhira O&M Division-2
Procuring Entity Code : Procuring Entity District : Satkhira
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : T-3/12, Dt. 03-07-2023 Tender/Proposal Status :
App ID : 189028 Tender/Proposal ID : 851700
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 224355600 Project Name : Rehabilitation of Polder no.14/1 in Khulna District
Tender/Proposal Package No. and Description : Sat-2/13
River Bank protection work from km. 12.230 to km. 12.620=390.00 meter in polder No 14/1 under Rehabilitation of Polder No14/1 in khulna Districtunder Satkhira O&M Division-2, BWDB, Satkhira.
Category : Construction work for water projects; Works for complete or part construction and civil engineering work;
Scheduled Tender/Proposal Publication
Date and Time :
06-Jul-2023 10:20 Tender/Proposal Document last selling /
downloading Date and Time :
03-Aug-2023 16:00
Pre - Tender/Proposal meeting Start
Date and Time :
06-Jul-2023 12:00 Pre - Tender/Proposal meeting End
Date and Time :
13-Jul-2023 17:00
Tender/Proposal Closing
Date and Time :
06-Aug-2023 14:30 Tender/Proposal Opening
Date and Time :
06-Aug-2023 14:30
Last Date and Time for Tender/Proposal Security
Submission :
06-Aug-2023 12:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

1. Payment of work will be made on the availability of budget & fund.
2. If any type of Structures/Obstacles is needed to dismantle to execute the work as per Design & Specification, the selected Contractor will do this at his own cost & arrangement. No Extra claim will be entertained in this regard.
3. Representative still picture & video of prework & postwork of the same location will be taken by contractor and submit to Procuring entity at contractor's own cost.
4. Quantity of work may increase or decrease.
5. Design may also be changed or modified (if required).
6. Prework & Postwork may be also taken by taskforce or other agency or jointly as per instruction of Higher Authority or PE.
7. After completion of the whole work final Measurement will be Taken. The final bill will be paid based on the final measurement.

8. Contract will be terminated if contractor's personnel is involved in any kind of unauthorized/illegal financial transaction from the locals during work.

Brief Description of Works :

River Bank protection work from km. 12.230 to km. 12.620=390.00 meter in polder No 14/1 under Rehabilitation of Polder No14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 4000
Mode of Payment :
Tender/Proposal Security Valid Up to : 31-Jan-2024
Tender/Proposal Valid Up to : 03-Jan-2024
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 River Bank protection work from km. 12.230 to km. 12.620=390.00 meter in polder No 14/1 under Rehabilitation of Polder No14/1 in khulna Districtunder Satkhira O&M Division-2, BWDB, Satkhira. Koyra - Khulna 6000000 05-Sep-2023 25-Dec-2024
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Md. Shahanaoyz Talukdar Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: Itagachha, Satkhira
City: Satkhira
Thana: Satkhira Sadar
District: Satkhira - 9400
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 0471-63335
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

There is a change in Tender Opening Date & Time, Last Date & Time for Tender/Proposal Security Submission, Tender/Proposal Document Last Selling Date and Time and Tender Closing Date & Time.

Field Name Old Value New Value
Document last selling date & time 03/08/2023 15:00 03/08/2023 16:00
Eligibility of Consultant

1. Payment of work will be made on the availability of budget & fund.
2. If any type of Structures/Obstacles is needed to dismantle to execute the work as per Design & Specification, the selected Contractor will do this at his own cost & arrangement. No Extra claim will be entertained in this regard.
3. Representative still picture & video of prework & postwork of the same location will be taken by contractor and submit to Procuring entity at contractor's own cost.
4. Quantity of work may increase or decrease.
5. Design may also be changed or modified (if required).
6. Prework & Postwork may be also taken by taskforce or other agency or jointly as per instruction of Higher Authority or PE.
7. After completion of the whole work final Measurement will be Taken. The final bill will be paid based on the final measurement.

8. Contract will be terminated if contractor's personnel is involved in any kind of unauthorized/illegal financial transaction from the locals during work.

1. Payment of work will be made on the availability of budget & fund.
2. If any type of Structures/Obstacles is needed to dismantle to execute the work as per Design & Specification, the selected Contractor will do this at his own cost & arrangement. No Extra claim will be entertained in this regard.
3. Representative still picture & video of prework & postwork of the same location will be taken by contractor and submit to Procuring entity at contractor's own cost.
4. Quantity of work may increase or decrease.
5. Design may also be changed or modified (if required).
6. Prework & Postwork may be also taken by taskforce or other agency or jointly as per instruction of Higher Authority or PE.
7. After completion of the whole work final Measurement will be Taken. The final bill will be paid based on the final measurement.

8. Contract will be terminated if contractor's personnel is involved in any kind of unauthorized/illegal financial transaction from the locals during work.

Opening Date & Time 03/08/2023 18:00 06/08/2023 14:30
Last date & time for Tender/Proposal Security Submission 03/08/2023 16:00 06/08/2023 12:00
Closing Date & Time 03/08/2023 18:00 06/08/2023 14:30
Brief Description of Goods,Works or Service

River Bank protection work from km. 12.230 to km. 12.620=390.00 meter in polder No 14/1 under Rehabilitation of Polder No14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.

River Bank protection work from km. 12.230 to km. 12.620=390.00 meter in polder No 14/1 under Rehabilitation of Polder No14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.

Amendment / Corrigendum/ Addendum No. : 1
S. No. File Name File Description File Size
(in KB)
1 Corrigendum-01 of Tender-01 of FY 2023-24.pdf Corrigendum-01 336030
 
Save As PDF