1. All tenderer as per ePW3 & registered in egp portal system are eligible.
2. Letter of Commitment for Bank's undertaking for Line of Credit should be submitted in prescribed format (Form PW3-7) as per ITT Clause 32.1(d) See section 8: Particular Specification.
3. Confirming the circular about Formation of JVCA, Business Share, Specific Experience, Turnover (See attached document of CPTU Circular in section 8: Particular Specification).
4. Payment will be made upon availability of fund. For this no claim will entertain.
5. Quoted amount of tender beyond 10% above/less than official estimated cost will be non-responsive.
HSB/W-04/Lot.-02/2016-17 Protective work along the Left bank of the Arial Khan River from km. 0.210 to km 0.390 total 180.00 m in connection with protection of Dhaka-Mawa-Bhanga-Khulna national highway adjacent to Hazi Shariatullah Bridge from the erosion of Arial Khan River project under Madaripur O&M Division BWDB Madaripur during the FY 2016-2017.