| Field Name |
Old Value |
New Value |
| PCC--.--
|
The PE is [insert complete name of the PE]. |
Member(Textbook)
National Curriculum and Textbook Board, Bangladesh
Room # 301 ( 2nd Floor), 69-70, Motijheel Commercial Area
Dhaka-1000, Bangladesh
Telephone # : 2233-80805
E-mail: membertextbook@nctb.gov.bd
|
| PCC--.--
|
The site(s)/ point(s) of delivery is/are: [ insert name(s) and detailed information on the location(s) of the site(s)] |
As stated in e-PG3-3A and e-PG3-3B
|
| PCC--.--
|
For notices, the PE’s contact details shall be:
Attention:
Address:
Telephone:
Facsimile number:
Electronic mail address:
For notices, the Supplier’s contact details shall be:
Attention:
Address:
Telephone:
Facsimile number:
Electronic mail address:
|
For notices, the PE’s contact details shall be:
Member(Textbook)
National Curriculum and Textbook Board, Bangladesh
Room # 301 ( 2nd Floor), 69-70, Motijheel Commercial Area
Dhaka-1000, Bangladesh
Telephone # 2233-80805
E-mail: membertextbook@nctb.gov.bd
For notices, the Supplier’s contact details shall be:
Attention:
Address:
Telephone:
Facsimile number:
Electronic mail address:
|
| PCC--.--
|
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section.
Please Click on the link in below to download the Updated Technical Specificaton:
http://drive.google.com/file/d/1YroWwWz0db9tmuuJ70NlcZSHEZLczMLP/view?usp=sharing |
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section.
Please Click on the link in below to download the Updated Technical Specificaton:
http://drive.google.com/file/d/1YroWwWz0db9tmuuJ70NlcZSHEZLczMLP/view?usp=sharing
|
| PCC--.--
|
The packing, marking and documentation within and outside the packages shall be: [insert in detail the type of packing required, the markings in the packing and all documentation required]
The outer packing may be clearly marked on at least four slides as follows:
Name and address of PE
Name of the Supplier
Contract Description
Final Destination/Delivery Point
Gross weight
Package number of total number of packages
Brief description of the content
Any special lifting instructions
Any special handling instructions
[Note:The above requirements should be reviewed by a PE on a case-by-case basis, with amendments being made as necessary.]
|
The packing, marking and documentation inside and outside the packages shall be:
(a) Braille Textbooks shall be supplied in Corrugated Carton Box. Size Height 12.5 x W10 x 18.00 (maximum)
(b) Books should be staked in Vertical position in a Box.
(c) Each Box shall be marked with (i) Number of Books (ii) description of Books (class and subject)
|
| PCC--.--
|
The documents to be furnished by the Supplier shall be as follows:
[insert the detail requirements of documents]
The documents to be furnished by the Supplier as follows:
a. Copies of Supplier’s invoice showing goods’ description, quantity, unit price, total amount;
b. Delivery note, railway receipt, or truck receipt;
c. manufacturer’s/ supplier’s warranty certificate (if any);
d. inspection certificate issued by the nominated inspection agency (or PE) and/ or the supplier’s factory inspection report (if any);
e. Certificate of origin, if any .
[Note: The above requirements should be reviewed by a PE on a case-by-case basis, with amendments being made as necessary.]
|
The documents to be furnished by the tenderer/supplier shall be as follows :
a) 5 (Five) copies of prescribed chalan to be submitted to the respective District Education Officer/Upazilla Secondary Education Officer (DEO/USEO).
b) Concerned Officials(s) will keep 3 (three) copies and return 2 (two) copies to the Tenderer having duly certified that the Textbooks have been received in good condition with received date.
c) Respective DEO/USEO will upload the Chalan within 24 hours of receiving the textbooks to the www.textbook.gov.bd.
|
| PCC--.--
|
The Contract price is: [insert the contract Price] |
The Contract price is: [insert the contract Price]
|
| PCC--.--
|
The Prices charged for the Goods supplied and the Related services performed [insert “shall” or “shall not”, as appropriate] be adjustable.
If prices are adjustable, the following method shall be used to calculate the price adjustment [see attachment to these PCC for a sample Price Adjustment Formula]
|
The Prices charged for the Goods supplied and the Related services performed shall not be adjustable.
|
| PCC--.--
|
The payment-delay period after which the PE shall pay interest to the supplier shall be [Indicate the days] days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it.
The interest rate that shall be applied is [ %] percent
[Note: The interest rate shall normally be 1% above the lending rate of scheduled banks in Bangladesh]
|
The payment-delay period after which the PE shall pay interest: N/A
|
| PCC--.--
|
The method and conditions of payment to be made to the Supplier under this Contract shall be as follows:
(a) Advance Payment: [usually ten (10)] percent of the Contract Price shall be paid within thirty (30) days of signing of the Contract, and upon submission of claim and a bank guarantee for equivalent amount valid until the Goods are delivered and in the form provided in the E-TD (PG3-10).
[For aid funded procurement Advance Payments may be applicable. However, for 100% GoB funded procurement Advance payments shall not be applicable unless otherwise specifically decided by Government. The PE should amend this clause as required for the particular procurement.]
(b) On Delivery and Acceptance: [usually ninety (90%) if advance payment is applicable, hundred (100%) if advance payment is not applicable ] percent of the Contract Price of the Goods delivered shall be paid within thirty (30) days of submission of documents specified in GCC Clause 23.1 supported by the Acceptance Certificate issued by the PE as per GCC Clause 24.
|
The method and conditions of payment to be made to the Supplier under this Contract shall be as follows:
i) Advance Payment: Not applicable.
ii) On Delivery and Acceptance :
(a) The Tenderer shall submit bill to Procuring Entity after completing the works as mentioned in the Contract. No payment will be paid for incomplete works. Partial payment are not allowed.
(b) 80% payment of the contract price shall be made upon 100% delivery of the Textbooks to respective destination in good condition after receiving the challan from the respective DEO/USEO/TSEO or their nominated officials name, date, designation with official seal (challan copy shall be uploaded through textbook.gov.bd).
Remaining 20% of the contract price shall be paid after receiving certified Invoice (challan) or acknowledgement from respective office.
(c) Tenderer shall submit 3 (three) copies of bills with a copy of Challan certified by respective DEO/USEO/TSEO. Payment will be made within the short time on receipt of bill along with certified Challan & ERC from the Monitoring and or Editing Section of NCTB.
(d) All payments shall be made in BDT.
(e) As insurance is mandatory, supplier must do insurance.
|
| PCC--.--
|
Payments shall be made in no case later than the days [Indicate the days] after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it.
[ Note: may be 30,45,60 etc]
|
Payments shall be made in no case later than the 60 (Sixty) days after submission of an invoice or request for payment by the Supplier and after the Procuring Entity has accepted it.
|
| PCC--.--
|
The inspections and tests shall be :[ insert type of test, time, place, procedures for carrying out the inspections and tests
Goods:
Type of test:
Time or milestone:
Place:
Procedure: ]
[Note: Depending on the type of Goods to be procured, there may be a need to provide for special inspections and/or tests to be carried out. In particular, this will be the case when the Goods are designed specifically for the purpose of the Project in question or where due to the nature of the Goods, there is a need to ensure compliance with certain technical specifications and requirements at an early stage. If there is a need for such special inspections and/or tests, the PCC should mention specific testing methods and the timing or milestones and places where the tests and/or inspections are to be carried out. ]
|
The inspections and tests shall be :
(a) The Purchaser or his representative or his Agent shall have the right to inspect the Tenderer's Press (es) and warehouse(s) to see storage condition and the quality of paper, progress and quality of Printing and binding and also the delivery of the Textbooks before receiving the books at the destination.
(b) During inspection if it is found that the printing and binding are not being done as per the specifications, the inspectors shall direct the Tenderer to make necessary correction or modifications.
(c) Any printed or delivered books rejected or declared defective by NCTB at any time of contact validity or warranty period will be considered as undelivered.
The Tenderer shall extend all assistance and co-operation during the time of inspection of the press (es) and warehouse(s).
|
| PCC--.--
|
The period of validity of the Warranty shall be : [ insert the period of validity of the warranty] |
The Warranty Period shall be 6 (six) months from date of acceptance of the Goods (Textbooks).
|
| PCC--.--
|
The Supplier shall correct any defects covered by the Warranty within [insert period, i.e. number of days] of being notified by the PE of the occurrence of such defects. |
The Tenderer must Repair and Replace any defective goods (textbooks) which is covered by the warranty within 14 (fourteen) days of being notified by the Procuring Entity of the occurrence of such defects.
|
| PCC--.--
|
The amount of Liquidated Damages is 0.10 percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay.
Guide to application of GCC Sub Clause 33.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formulae
T = V x Px n
Where;
T = Total amount of Liquidated Damages
V = Contract Value of undelivered Goods or any part thereof, delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable
P = Percent-rate at which the Liquidated Damages shall be imposed per day of delay
n = No of days delayed for delivery of the undelivered Goods or any part thereof, after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable.
The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is ten (10) percent of the final Contract Price of the whole of the Goods and related services.
|
The amount of Liquidated Damages is 0.10 percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay.
Guide to application of GCC Sub Clause 33.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formulae
T = V x Px n
Where;
T = Total amount of Liquidated Damages
V = Contract Value of undelivered Goods or any part thereof, delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable
P = Percent-rate at which the Liquidated Damages shall be imposed per day of delay
n = No of days delayed for delivery of the undelivered Goods or any part thereof, after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable.
The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is ten (10) percent of the final Contract Price of the whole of the Goods and related services.
|
| PCC--.--
|
Arbitration shall take place in: Dhaka, Bangladesh. |
Arbitration shall take place in: Dhaka, Bangladesh.
|
| PCC--.--
|
Arbitration shall take place in: [insert the name of the Place and addresses] |
The Adjudicator jointly appointed by the Parties is:
The Chairman
National Curriculum and Textbook Board
69-70, Motijheel Commercial Area, Floor 4th, Room # 501
Dhaka-1000, Bangladesh.
Telephone # : 223385432 & Fax : 02-9565724
e-mail : chairman@nctb.gov.bd
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Engineers, Bangladesh (IEB).
|
| PCC--.--
|
The following documents shall also be part of the Contract:
(i) Form of Contract Agreement.
(ii) Notification of Award.
(iii) Tender submission letter.
(iv) Tender information sheet.
(v) Price schedule for goods.
(vi) Particular Conditions of Contract (PCC)
(vii) General Conditions of Contract (GCC)
(viii)Technical Specifications.
(ix) Schedule of requirements.
(x) Signing Authority if the signatory is other than proprietor or owner
(xi) Performance security.
(xii) Insurance as per GCC for goods and related service.
(xiii) Other documents including/Correspondences. |
The following documents shall also be part of the Contract:
(i) Form of Contract Agreement.
(ii) Notification of Award.
(iii) Tender submission letter.
(iv) Tender information sheet.
(v) Price schedule for goods.
(vi) Particular Conditions of Contract (PCC)
(vii) General Conditions of Contract (GCC)
(viii)Technical Specifications.
(ix) Schedule of requirements.
(x) Signing Authority if the signatory is other than proprietor or owner
(xi) Performance security.
(xii) Insurance as per GCC for goods and related service.
(xiii) Other documents including/Correspondences.
|
| Field Name |
Old Value |
New Value |
| PCC--.--
|
The scope of Supply shall be defined in: [insert “section 6, Schedule of Supply” ] or [At the time of awarding the Contract, the PE shall specify any change in the Scope of Supply with respect to Section 6, Schedule of supply included in the E-TD. Such changes may be due, for instance, if the quantities of goods and related Services are increased or decreased at time of award] |
The Scope of Supply shall be defined in e-PG3-3A, e-PG3-3B and Drawings Section.
Please Click on the link in below to download the Updated Technical Specificaton:
http://drive.google.com/file/d/1YroWwWz0db9tmuuJ70NlcZSHEZLczMLP/view?usp=sharing
|
| PCC--.--
|
The amount of Liquidated Damages is [insert between 0.05 and 0.10] of ONE (1) percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay.
Guide to application of GCC Sub Clause 35.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formulae
T = V x Px n
Where;
T = Total amount of Liquidated Damages
V = Contract Value of undelivered Goods or any part thereof, delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable
P = Percent-rate at which the Liquidated Damages shall be imposed per day of delay
n = No of days delayed for delivery of the undelivered Goods or any part thereof, after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable.
The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is [insert ≤ ten (10)] percent of the final Contract Price of the whole of the Goods and related services.
|
The amount of Liquidated Damages is 0.10 percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay.
Guide to application of GCC Sub Clause 33.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formulae
T = V x Px n
Where;
T = Total amount of Liquidated Damages
V = Contract Value of undelivered Goods or any part thereof, delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable
P = Percent-rate at which the Liquidated Damages shall be imposed per day of delay
n = No of days delayed for delivery of the undelivered Goods or any part thereof, after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable.
The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is ten (10) percent of the final Contract Price of the whole of the Goods and related services.
|
| PCC--.--
|
The name of the Adjudicator[insert the name of the Adjudicator]
The name of the appointing authority of the Adjudicator [ insert the name of the appointing authority]
|
Arbitration shall take place in: Dhaka, Bangladesh.
|
| PCC--.--
|
The following documents shall also be part of the Contract: [insert the name of the documents] |
The following documents shall also be part of the Contract:
(i) Form of Contract Agreement.
(ii) Notification of Award.
(iii) Tender submission letter.
(iv) Tender information sheet.
(v) Price schedule for goods.
(vi) Particular Conditions of Contract (PCC)
(vii) General Conditions of Contract (GCC)
(viii)Technical Specifications.
(ix) Schedule of requirements.
(x) Signing Authority if the signatory is other than proprietor or owner
(xi) Performance security.
(xii) Insurance as per GCC for goods and related service.
(xiii) Other documents including/Correspondences.
|
| Brief Description of Goods,Works or Service
|
For Printing (With Paper), Binding and Supplying of braille textbooks (Class-1, 4, 5, 6 & 7) to be distributed free of cost for the Academic Year 2024
|
For Printing (With Paper), Binding and Supplying of braille textbooks (Class-1, 4, 5, 6 & 7) to be distributed free of cost for the Academic Year 2024
|