| Eligibility of Tenderer : |
1) As described in the Tender Documents.
2) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Management Contractor shall be 05(five) years. [years will be counted backward from the date of publication of IFT in the newspaper].
3) The minimum specific experience as a Prime Contractor or Management Contractor in construction works of at least 1 (one) contract of similar nature, complexity and methods/construction technology successfully completed within the last 5 (five) years, with a value of at least BDT 1272.00 Lakh. [years will be counted backward from the date of publication of IFT in the newspaper].
4) The required average annual construction turnover shall be greater than BDT 2332.00 Lakh over the last 5 (five) years. [years will be counted backward from the date of publication of IFT in the newspaper]
5) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be BDT 530.00 Lakh.
6)The Minimum Tender Capacity shall be BDT 1696.00 Lakh
|
| Brief Description of Works : |
R-1100: Construction of Internal Road of Bangladesh Agriculture University area by RCC Pavement. Part-A( Dairy Farm department road, L=236m), Part-B(Security Zone-1 to Dairy Farm Department road, L=1896m),Part-C(D-13 no road=831m),Part-D(Baitul aman Mosque road,L=200m Part-E(Security Zone-1 to KB High school road.L=831m), Part-F(Institute of Food Security road.L=438m)Part-G=(Security Zone-1 to Sishubag school.L=453.5m),Part-H(North side of Sishubag school,L=247m),Part-I(East-1 no road D-11 .L=187m),Part-J(East-1 no road D-12.L=255m),Part-L(Boishaki chottor road.L=570m),Part-M(South side of Boishaki chottor road.L=490m); Total Length=7574.5m R-1101: Part-02-Construction internal road of KB high school by RCC Pavement in ward no.21(Length=380m) R-1102: Construction of BC road by the side of Dipu commissioner house in ward no-21(Total Length=262m) R-1105:Construction of RCC road starting from Bangladesh Agriculture University labour shed to by the side of Boundary wall(From Pagla Bazar to Narikel Bagan. L=785m) D-1116:Construction of RCC pipe drain Starting from Bangladesh Agriculture University staff quarter to Botanical Garden(Part. A, 900mm dia, L=390m, Part-B, 600mm dia, L=670mm dia, Part-C, 600mm dia, L=150m , Part-D, 300mm dia, L=60m, Part-E,300mm dia, L=280m, Part-F, 30mm dia,L=80m & Part-G,300mm dia, L=80m, Total Length=1710m)
|