| Eligibility of Consultant
|
As Per ITT & TDS.
|
As Per ITT & TDS.
|
| TDS/PDS--C. Qualification Criteria--
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 (Three) years.
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (One) contract of similar nature, complexity and methods/construction technology successfully completed of PCC Bridge with 45m Arch Span having minimum 1000mm dia pile with cofferdam foundation within the last 5 (Five) year, each with a value of at least Tk. 3700.00 Lac (Thirty-Seven Crore) only. |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 (Three) years.
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (One) contract of similar nature, complexity and methods/construction technology successfully completed of PCC Bridge with 45m Arch Span having minimum 1000mm dia pile with cofferdam foundation within the last 5 (Five) year, each with a value of at least Tk. 3700.00 Lac (Thirty-Seven Crore) only.
30.1 Tenderer shall furnish a Technical Proposal including a statement of work methods, equipment , personnel and schedule, in sufficient detail to demonstrate the adequacy of the Tenderer’s proposal to meet the work requirements and the completion time.It will be the integral part of Technical Evaluation. Incase of non-submission or Inappropriate submission of Technical Proposal the Tender shall be considered as non-responsive.
|
| TDS/PDS--C. Qualification Criteria--
|
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows :
|
TDS Clauses References |
Requirements by summation |
Requirements for Lead Partner of JVCA |
Requirements for other Partner(s) of JVCA |
|
ITT-15.1(a) |
Summation not applicable |
Same as stated in TDS |
Same as for
Leading Partner
|
|
ITT-15.1(b) |
100% |
At least one Contract |
Minimum requirement not applicable |
|
ITT-16.1(a) |
100% |
40% |
25% |
|
ITT-16.1(b) |
100% |
40% |
25% |
|
ITT-16.1(d) |
100% |
40% |
25% |
|
ITT-17.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-18.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT 19.4 |
Lead partner shall be the Nominated Partner (partner-in-charge) of JVCA. Otherwise the tender will be non-responsive. |
|
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows :
|
TDS Clauses References |
Requirements by summation |
Requirements for Lead Partner of JVCA |
Requirements for other Partner(s) of JVCA |
|
ITT-15.1(a) |
Summation not applicable |
Same as stated in TDS |
Same as for
Leading Partner
|
|
ITT-15.1(b) |
100% |
At least one Contract |
Minimum requirement not applicable |
|
ITT-16.1(a) |
100% |
40% |
25% |
|
ITT-16.1(b) |
100% |
40% |
25% |
|
ITT-16.1(d) |
100% |
40% |
25% |
|
ITT-17.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-18.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
| TDS/PDS--C. Qualification Criteria--
|
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300.00 |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300.00
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows :
|
ITT 19.4 |
Lead partner shall be the Nominated Partner (partner-in-charge) of JVCA. Otherwise the tender will be non-responsive. |
|
| TDS/PDS--C. Qualification Criteria--
|
The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None. |
The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None.
|
| TDS/PDS--D. Tender Preparation--
|
Tenderers shall submit with its Technical Offers the following additional documents:
Technical proposal as stated under ITT Clause 30.
|
ITT 30.1 |
Technical Proposal must include the following chapters:
a. Method of Statement: Tenderer will describe the methodology of the activities to be performed under the contract. Tenderer should identified the risk and explain the mitigation procedures in technical proposal to address them. Tenderer will submit the construction methodology and risk mitigation method statement by considering the design, specifications and time frame of the contract. Alternative methodology for changing the design will not be acceptable. The tenderer must explain the sub-structure work methodology (boring, casting, pile load test, integrity test, etc.), manufacturing of concrete (batching plant, transport, placing and mixing of concrete), Arch Girder Construction Methodology, scaffolding materials and procedure, super-structure work methodology etc. The number of labour groups to be engaged to complete the contract within the stipulated time must be described in the technical proposal with use of equipment types. Detail description of safety, security and environmental measures to be taken during execution of the contract.
Materials procurement, source, procurement plan, mobilization plan, etc. will be described in the technical proposal.
b. Equipment: Tenderer will provide the list of equipment (lease or own with proof of documents with source) that will be used if the contract is awarded and its time frame. The statement should be realistic enough that not only satisfy the ITT Clause 18 but also satisfy the equipment schedule (time and activities involved, number of equipment like Rotary-rig, square meter of steel shuttering materials and type, number of batching plant and its capacity, equipment brand and year of manufacture, etc.) for ensuring the progress of the contract as per work plan. Tenderer will mention the brand of the equipment as well as engine number where applicable. The equipment, with detail description, mobilization schedule will be submitted by the tenderer which will be an integral part of the contract. Before submitting the tender, tenderer shall visit the proposed site and submit the construction equipment accessibility plan and also mentioned the mode of construction equipment mobilization.
c. Personnel: Tenderer will provide the list of experienced personnel which will be available during execution of the contract as specified if awarded. The responsibility and availability of the personnel to execute the contract will be submitted in the proposal. The statement should be realistic enough that not only satisfy the ITT Clause 17 but also satisfy the personnel schedule (time and activities involved) for ensuring the progress of the contract as per work plan. Availability of personnel must confirm before signing the contract. If replacement require procuring entity’s prior approval will be obtained and replaced person must possess equal or higher qualification.
d. Work plan: Tenderer will provide a work plan in details as well as list all activities/sub activities to be performed under the contract within the given time frame. Please provide the date of every milestone also. Only bar chart is not acceptable. In work plan tenderer will describe each activities/sub activities with duration, milestones and predecessor & successor actions of every activity. PERT/CPM using MS Project will be more acceptable.
e. Others: Any other statement or documents that tenderer needs to describe the Technical proposal to satisfy his/her proposal may be mentioned in the technical proposal. Any tenderer may be invited to present the technical proposal to TEC/or LGED expert group and Procuring Entity’s comments must be incorporated in final technical proposal which will then be an integral part of the contract.
|
|
Tenderers shall submit with its Technical Offers the following additional documents:
Technical proposal as stated under ITT Clause 30.
|
ITT 30.1 |
Technical Proposal must include the following chapters:
a. Method of Statement: Tenderer will describe the methodology of the activities to be performed under the contract. Tenderer should identified the risk and explain the mitigation procedures in technical proposal to address them. Tenderer will submit the construction methodology and risk mitigation method statement by considering the design, specifications and time frame of the contract. Alternative methodology for changing the design will not be acceptable. The tenderer must explain the sub-structure work methodology (boring, casting, pile load test, integrity test, etc.), manufacturing of concrete (batching plant, transport, placing and mixing of concrete), Arch Girder Construction Methodology, scaffolding materials and procedure, super-structure work methodology etc. The number of labour groups to be engaged to complete the contract within the stipulated time must be described in the technical proposal with use of equipment types. Detail description of safety, security and environmental measures to be taken during execution of the contract.
Materials procurement, source, procurement plan, mobilization plan, etc. will be described in the technical proposal.
b. Equipment: Tenderer will provide the list of equipment (lease or own with proof of documents with source) that will be used if the contract is awarded and its time frame. The statement should be realistic enough that not only satisfy the ITT Clause 18 but also satisfy the equipment schedule (time and activities involved, number of equipment like Rotary-rig, square meter of steel shuttering materials and type, number of batching plant and its capacity, equipment brand and year of manufacture, etc.) for ensuring the progress of the contract as per work plan. Tenderer will mention the brand of the equipment as well as engine number where applicable. The equipment, with detail description, mobilization schedule will be submitted by the tenderer which will be an integral part of the contract. Before submitting the tender, tenderer shall visit the proposed site and submit the construction equipment accessibility plan and also mentioned the mode of construction equipment mobilization.
c. Personnel: Tenderer will provide the list of experienced personnel which will be available during execution of the contract as specified if awarded. The responsibility and availability of the personnel to execute the contract will be submitted in the proposal. The statement should be realistic enough that not only satisfy the ITT Clause 17 but also satisfy the personnel schedule (time and activities involved) for ensuring the progress of the contract as per work plan. Availability of personnel must confirm before signing the contract. If replacement require procuring entity’s prior approval will be obtained and replaced person must possess equal or higher qualification.
d. Work plan: Tenderer will provide a work plan in details as well as list all activities/sub activities to be performed under the contract within the given time frame. Please provide the date of every milestone also. Only bar chart is not acceptable. In work plan tenderer will describe each activities/sub activities with duration, milestones and predecessor & successor actions of every activity. PERT/CPM using MS Project will be more acceptable.
e. Others: Any other statement or documents that tenderer needs to describe the Technical proposal to satisfy his/her proposal may be mentioned in the technical proposal. Any tenderer may be invited to present the technical proposal to TEC/or LGED expert group and Procuring Entity’s comments must be incorporated in final technical proposal which will then be an integral part of the contract.
|
|
| Brief Description of Goods,Works or Service
|
Construction of 270.00m Long Bridge Over Ichamati River on Kartikpur (Dohar)- Barrah-Dohar- Balenga-Kaishakhali Bundh- Sonabaju- Sikaripara-Daudpur. Bandura- Mazir kanda Road Ch. 17365.00m, under Upazila: Nawabganj, District: Dhaka. (Road ID No. 326622006). Package No: DDIRWSP/Dhaka/Nawabganj/23-24/BR-06
|
Construction of 270.00m Long Bridge Over Ichamati River on Kartikpur (Dohar)- Barrah-Dohar- Balenga-Kaishakhali Bundh- Sonabaju- Sikaripara-Daudpur. Bandura- Mazir kanda Road Ch. 17365.00m, under Upazila: Nawabganj, District: Dhaka. (Road ID No. 326622006). Package No: DDIRWSP/Dhaka/Nawabganj/23-24/BR-06
|