View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to unavoidable circumstances some changes has been made. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 20/08/2023 10:05 | 27/08/2023 10:05 |
| Eligibility of Consultant | As per TDS and following additional conditions will be applicable : 1. Note that (a) Boring rate must be higher with depth increase. 2. In case of Line of Credit Certificate as a Liquid Asset certificate, Please follow 2 mandatory instructions noted below : a) The certificate must be substantiated by any scheduled Bank of Bangladesh in the format as specified (Form PW3-7, attached in Particular Specifications section of this e Tender documents), without alteration, issued not earlier than twenty eight (28) days prior to the day of the original deadline for submission of Tenders. b) The tenderer must have available Credit Limit sanction (approved) by competent authority of any scheduled Bank of Bangladesh. During verification of Credit Line certificate Credit Limit sanction letter / approval letter might be asked. Failure of having sufficient financial capacity will be termed as technically non-responsive. c) The tenderer must have available Credit Limit sanction (approved) by competent authority of any scheduled Bank of Bangladesh. |
As per TDS and following additional conditions will be applicable :
1. Note that (a) Boring rate must be higher with depth increase. 2. In case of Line of Credit Certificate as a Liquid Asset certificate, Please follow 2 mandatory instructions noted below : a) The certificate must be substantiated by any scheduled Bank of Bangladesh in the format as specified (Form PW3-7, attached in Particular Specifications section of this e Tender documents), without alteration, issued not earlier than twenty eight (28) days prior to the day of the original deadline for submission of Tenders. b) The tenderer must have available Credit Limit sanction (approved) by competent authority of any scheduled Bank of Bangladesh. During verification of Credit Line certificate Credit Limit sanction letter / approval letter might be asked. Failure of having sufficient financial capacity will be termed as technically non-responsive. c) The tenderer must have available Credit Limit sanction (approved) by competent authority of any scheduled Bank of Bangladesh. |
| Opening Date & Time | 21/08/2023 10:05 | 27/08/2023 23:05 |
| Last date & time for Tender/Proposal Security Submission | 21/08/2023 10:00 | 27/08/2023 11:00 |
| Closing Date & Time | 21/08/2023 10:05 | 27/08/2023 23:05 |
| Brief Description of Goods,Works or Service | Installation of 38mm dia 130 nos Deep tubewell with 6 no. Hand pump at jhalokathi Nalchity upazilla in Jhalokathi district under safe water supply throughout the country (PSWSC) project (FY: 2023-2024) |
Installation of 38mm dia 130 nos Deep tubewell with 6 no. Hand pump at jhalokathi Nalchity upazilla in Jhalokathi district under safe water supply throughout the country (PSWSC) project (FY: 2023-2024) |