View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | Correction of TDS. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 22/02/2017 16:00 | 27/02/2017 16:00 |
| Eligibility of Consultant | As stated in Tender Document.
As stated in ITT |
As stated in Tender Document.
As stated in ITT |
| Opening Date & Time | 23/02/2017 13:30 | 28/02/2017 13:30 |
| Last date & time for Tender/Proposal Security Submission | 23/02/2017 12:00 | 28/02/2017 12:00 |
| Closing Date & Time | 23/02/2017 13:00 | 28/02/2017 13:00 |
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets i.e. banking instrument or working capital or credit facilities or credit line of the Tenderer shall be Tk . 1350000.00
-Tenderer shall demonstrate the resources sufficient to meet the aggregate of the value for the individual contracts/contractual commitments, in case, participation is more than one package/lot from same procuring entity and other procuring entity (ies). |
The minimum amount of liquid assets i.e. banking instrument or working capital or credit facilities or credit line of the Tenderer shall be Tk . 2525000.00
-Tenderer shall demonstrate the resources sufficient to meet the aggregate of the value for the individual contracts/contractual commitments, in case, participation is more than one package/lot from same procuring entity and other procuring entity (ies). |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk. 2200000.00 over the last 05(Five) years. [Years counting backward from the date of publication of IFT in the newspaper] |
The required average annual construction turnover shall be greater than Tk. 4040000.00 over the last 05(Five) years. [Years counting backward from the date of publication of IFT in the newspaper] |
| TDS/PDS--C. Qualification Criteria-- | The minimum capacity shall be: Tk. 40,50,000.00
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
The minimum capacity shall be: Tk. 75,75,000.00
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of similar works of at least Tk. 2700000.00 under 01(one) of contract(s) over a period of 05(Five) years shall be required. [Years counting backward from the date of publication of IFT in the newspaper] |
A satisfactory completion of similar works of at least Tk. 5050000.00 under 01(one) of contract(s) over a period of 05(Five) years shall be required. [Years counting backward from the date of publication of IFT in the newspaper] |
| Brief Description of Goods,Works or Service |
IRIDP-2/RNG/ DW-120 |
IRIDP-2/RNG/ DW-120 |
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Correction of PCC Section-B, C & F. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As stated in Tender Document.
As stated in ITT |
As stated in Tender Document.
As stated in ITT |
| PCC--B. Time Control-- |
The Start Date shall be [insert date ] |
The Start Date shall be : As stated in tender notice. |
| PCC--B. Time Control-- |
The Intended Completion Date for the whole of the Works shall be [insert date] |
The Intended Completion Date for the whole of the Works shall be : As stated in tender notice. |
| PCC--B. Time Control-- |
The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract. |
The Contractor shall submit a Programme for the Works within Seven (07) days of signing the Contract. |
| PCC--F. Termination-- | The percentage to apply to the contract value of the works not completed, representing the Procuring Entityâ??s additional cost for completing the uncompleted Works, is [state percentage] percent.
[ usually between ten (10) to twenty (20) percent depending on the nature of the Works] |
The Percentage to apply to the contract value of the works not completed representing the Procuring Entity’s additional cost for completing the uncompleted works, is compensation assessed as mentioned in PCC 28.f |
| PCC--H. Disputes and Settlement-- |
The arbitration shall be conducted in the place mentioned below; |
The arbitration shall be conducted in the place mentioned below; |
| Brief Description of Goods,Works or Service |
IRIDP-2/RNG/ DW-120 |
IRIDP-2/RNG/ DW-120 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Amendment for Tender Notice. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As stated in Tender Document. |
As stated in Tender Document.
As stated in ITT |