View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Local Government, Rural Development and Co-operatives Division : Local Government Division
Organization : Local Government Engineering Department (LGED) Procuring Entity Name : Office of the Executive Engineer, LGED, Rangpur
Procuring Entity Code : Procuring Entity District : Rangpur
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : APP ID: 40864 Tender/Proposal Status :
App ID : 40864 Tender/Proposal ID : 85877
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 5-3731-5143 Project Name : Important Rural Infrastructures Development Project on Priority Basis-2
Tender/Proposal Package No. and Description : IRIDP-2/RNG/ DW-119
Improvement of Mominpur hat to Dakkhin Mominpur Road Ch. 1200-2225m. Road ID No. 185494026 Rangpur-S
Category : Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
Scheduled Tender/Proposal Publication
Date and Time :
05-Feb-2017 18:00 Tender/Proposal Document last selling /
downloading Date and Time :
27-Feb-2017 16:00
Pre - Tender/Proposal meeting Start
Date and Time :
06-Feb-2017 10:00 Pre - Tender/Proposal meeting End
Date and Time :
13-Feb-2017 15:00
Tender/Proposal Closing
Date and Time :
28-Feb-2017 13:00 Tender/Proposal Opening
Date and Time :
28-Feb-2017 13:30
Last Date and Time for Tender/Proposal Security
Submission :
28-Feb-2017 12:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As stated in Tender Document.

As stated in ITT
-As per ITT-30.3 Tenderers having quoted the tender price more than 10 (Ten) percent above or below the official cost estimate, the tender shall be rejected.
-In case of tie for the lowest evaluated price, the Tenderer shall be selected based on as stated in ITT-30.4

 

Brief Description of Works :

IRIDP-2/RNG/ DW-119
Improvement of Mominpur hat to Dakkhin Mominpur Road (Ch. 1200-2225m). Road ID No. 185494026 [Rangpur-S]

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 2000
Mode of Payment :
Tender/Proposal Security Valid Up to : 26-Jun-2017
Tender/Proposal Valid Up to : 29-May-2017
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
DW-119 Improvement of Mominpur hat to Dakkhin Mominpur Road (Ch. 1200-2225m). Road ID No. 185494026 [Rangpur-S] Rangpur Sadar Upazila 107000 28-Mar-2017 23-Nov-2017
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Md. Akhter Hossain Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: XEN Office, LGED, Dhap, Jail Road, Rangpur
City: Rangpur
Thana: Rangpur Sadar
District: Rangpur - 5400
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 0521-62362
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  3 
Amendment / Corrigendum Text :

Correction of TDS.

Field Name Old Value New Value
Document last selling date & time 22/02/2017 16:00 27/02/2017 16:00
Eligibility of Consultant

As stated in Tender Document.

As stated in ITT
-As per ITT-30.3 Tenderers having quoted the tender price more than 10 (Ten) percent above or below the official cost estimate, the tender shall be rejected.
-In case of tie for the lowest evaluated price, the Tenderer shall be selected based on as stated in ITT-30.4

 

As stated in Tender Document.

As stated in ITT
-As per ITT-30.3 Tenderers having quoted the tender price more than 10 (Ten) percent above or below the official cost estimate, the tender shall be rejected.
-In case of tie for the lowest evaluated price, the Tenderer shall be selected based on as stated in ITT-30.4

 

Opening Date & Time 23/02/2017 13:30 28/02/2017 13:30
Last date & time for Tender/Proposal Security Submission 23/02/2017 12:00 28/02/2017 12:00
Closing Date & Time 23/02/2017 13:00 28/02/2017 13:00
TDS/PDS--C. Qualification Criteria--

The minimum amount of liquid assets i.e. banking instrument or working capital or credit facilities or credit line of the Tenderer shall be Tk . 2525000.00

 

-Tenderer shall demonstrate the resources sufficient to meet the aggregate of the value for the individual contracts/contractual commitments, in case, participation is more than one package/lot from same procuring entity and other procuring entity (ies).
-Banking instrument- authenticated by bank statement, savings instrument from any scheduled bank.
-Working capital â?? authenticated by recent past Audit Reports.
-Credit facilities â?? authenticated by credit sanctioned letter and bank statement of the credit account.
-Credit line- authenticated by any scheduled bank in the format as specified (Form PW2a-3), without alteration.
-Banking instrument, statement of Credit facilities and Credit line issued not earlier than 28 (twenty eight) days) prior to the day of the original deadline for submission of the Tender.

The minimum amount of liquid assets i.e. banking instrument or working capital or credit facilities or credit line of the Tenderer shall be Tk . 1350000.00

 

-Tenderer shall demonstrate the resources sufficient to meet the aggregate of the value for the individual contracts/contractual commitments, in case, participation is more than one package/lot from same procuring entity and other procuring entity (ies).
-Banking instrument- authenticated by bank statement, savings instrument from any scheduled bank.
-Working capital – authenticated by recent past Audit Reports.
-Credit facilities – authenticated by credit sanctioned letter and bank statement of the credit account.
-Credit line- authenticated by any scheduled bank in the format as specified (Form PW2a-3), without alteration.
-Banking instrument, statement of Credit facilities and Credit line issued not earlier than 28 (twenty eight) days) prior to the day of the original deadline for submission of the Tender.

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk. 4040000.00 over the last 05(Five) years.

[Years counting backward from the date of publication of IFT in the newspaper]

The required average annual construction turnover shall be greater than Tk. 2200000.00 over the last 05(Five) years.

[Years counting backward from the date of publication of IFT in the newspaper]

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be: Tk. 75,75,000.00


The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.
 

The minimum capacity shall be: Tk. 40,50,000.00


The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.
 

TDS/PDS--C. Qualification Criteria--

A satisfactory completion of similar works of at least Tk. 5050000.00 under 01(one) of contract(s) over a period of 05(Five) years shall be required.

[Years counting backward from the date of publication of IFT in the newspaper]

A satisfactory completion of similar works of at least Tk. 2700000.00 under 01(one) of contract(s) over a period of 05(Five) years shall be required.

[Years counting backward from the date of publication of IFT in the newspaper]

 Amendment / Corrigendum No. :  2 
Amendment / Corrigendum Text :

Correction of PCC Section- D & F.

Field Name Old Value New Value
Eligibility of Consultant

As stated in Tender Document.

As stated in ITT
-As per ITT-30.3 Tenderers having quoted the tender price more than 10 (Ten) percent above or below the official cost estimate, the tender shall be rejected.
-In case of tie for the lowest evaluated price, the Tenderer shall be selected based on as stated in ITT-30.4

 

As stated in Tender Document.

As stated in ITT
-As per ITT-30.3 Tenderers having quoted the tender price more than 10 (Ten) percent above or below the official cost estimate, the tender shall be rejected.
-In case of tie for the lowest evaluated price, the Tenderer shall be selected based on as stated in ITT-30.4

 

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:
[list events or state none ]
 

The following additional events shall also be the Compensation Events :

If the contract is terminated following the fundamental breach of contract by the contractor
To quantify such Compensation the steps mentioned below shall apply :


(i) A Compensation Assessment Committee comprising of minimum 03 (Three) members shall be formed by the Procuring Entity/Project Manager to assess the Compensation to complete the remaining works as per latest LGED rate schedule. This Assessed Compensation would be the Estimated Cost of Uncompleted Contract Quantity as per latest LGED rate Schedule less the Quoted amount of the same by the Terminated Contractor representing in percent (%) w.r.t. Uncompleted contract Amount of the Terminated Contract but in no case it shall be less than minimum 10 (Ten)% of the Uncompleted Contract Amount.

(ii) The Assessed Compensation as recommended by the Compensation Assessment Committee shall be recoverable as instructed in GCC clause 38.


(iii) In case of failure to realize such Compensation by the contractor, the Procuring Entity/Project Manager shall take necessary measure to recover the same from any dues remained in his office (Such as Performance Security, Retention Money, Tender Security, Pending Bill of other contract etc). Furthermore if the total amount due to the Procuring Entity still exceeds any payment due to the Contractor, the difference shall be a debt payable to the Procuring Entity.

(iv) The Procuring Entity/Project Manager shall however proceed to complete the remaining work engaging new contractor.

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.

The proportion of payments to be retained is five(5) percent.

PCC--D. Cost Control--

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.
[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]
 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is ten (10) percent of the final Contract price of the whole of the Works.

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of itâ??s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of itâ??s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

The amount of Liquidated Damages or in other words Delay Damages is 0.05 percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.

PCC--F. Termination--

The percentage to apply to the contract value of the works not completed, representing the Procuring Entityâ??s additional cost for completing the uncompleted Works, is [state percentage] percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

The Percentage to apply to the contract value of the works not completed representing the Procuring Entity’s additional cost for completing the uncompleted works, is compensation assessed as mentioned in PCC 28.f

PCC--H. Disputes and Settlement--

The arbitration shall be conducted in the place mentioned below;
[state name of place with location and district ]
 

The arbitration shall be conducted in the place mentioned below;
LGED, Rangpur.

 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Amendment for Tender Notice.

Field Name Old Value New Value
Eligibility of Consultant

As stated in Tender Document.

As stated in Tender Document.

As stated in ITT
-As per ITT-30.3 Tenderers having quoted the tender price more than 10 (Ten) percent above or below the official cost estimate, the tender shall be rejected.
-In case of tie for the lowest evaluated price, the Tenderer shall be selected based on as stated in ITT-30.4

 

 
Save As PDF