View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Changes in BOQ quantity and estimated cost. |
| Field Name | Old Value | New Value |
|---|---|---|
| Completion Date(Lot No : HED-Patiya-PW-04) | 31/12/2024 | 31/12/2025 |
| Document last selling date & time | 12/09/2023 10:00 | 17/09/2023 10:00 |
| Eligibility of Consultant | 1. All the tenderers/firms must be registered with CPTU through e-GP portal. 2. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instruction: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (compaction, compressive strength, materials test etc.) should be carried by the Contractor himself. 7. Bill would be given as per post work/block acceptance report provided by Task Force/Chief Monitoring, BWDB. |
1. All the tenderers/firms must be registered with CPTU through e-GP portal. 2. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instruction:
1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (compaction, compressive strength, materials test etc.) should be carried by the Contractor himself. 7. Bill would be given as per post work/block acceptance report provided by Task Force/Chief Monitoring, BWDB. |
| Opening Date & Time | 12/09/2023 12:00 | 17/09/2023 12:00 |
| Last date & time for Tender/Proposal Security Submission | 12/09/2023 11:00 | 17/09/2023 11:00 |
| Start Date(Lot No : HED-Patiya-PW-04) | 31/10/2023 | 15/11/2023 |
| Closing Date & Time | 12/09/2023 12:00 | 17/09/2023 12:00 |
| Brief Description of Goods,Works or Service | Bank Protection work Along the Right Bank of Shrimai Khal from Km. 0.000 to Km. 0.100 (=100.00m.) in Tekerpuni Buddhist Temple area, from Km.0.000 to Km. 0.250 (=250.00m.) in Mahbub Chairman area (D/S), from Km. 0.000 to Km. 0.250 (=250.00m.) in Mahbub Chairman area (U/S) at Vatikhain Union & from Km. 0.000 to Km. 0.100 (=100.00m.) in Ahmmadia Pouro Mosque/Paikpara area at Patiya Pourashava, Total =(100+250+250+100) = 700.00 m in Patiya Upazilla, Dist- Chattogram under "Construction of Multipurpose Hydraulic Elevator Dam across Shrimai Khal at Patiya, Chattogram District" |
Bank Protection work Along the Right Bank of Shrimai Khal from Km. 0.000 to Km. 0.100 (=100.00m.) in Tekerpuni Buddhist Temple area, from Km.0.000 to Km. 0.250 (=250.00m.) in Mahbub Chairman area (D/S), from Km. 0.000 to Km. 0.250 (=250.00m.) in Mahbub Chairman area (U/S) at Vatikhain Union & from Km. 0.000 to Km. 0.100 (=100.00m.) in Ahmmadia Pouro Mosque/Paikpara area at Patiya Pourashava, Total =(100+250+250+100) = 700.00 m in Patiya Upazilla, Dist- Chattogram under "Construction of Multipurpose Hydraulic Elevator Dam across Shrimai Khal at Patiya, Chattogram District" |