View IFT /PQ / REOI / RFP / PPS Notice Details
Amendment / Corrigendum Detail
|
Amendment / Corrigendum No. : 1
|
| Amendment / Corrigendum Text : |
Amendment/ Corrigendum made in TDS Clause ITT 15.1 (b) |
| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
1. All the tenderers must be registered with e-GP portal through CPTU.
2. Tenderer should fulfill all criteria's which are stated in TDS.
3. Tenderer should submit their credit line facility/Liquid assets certificate according to Form PW3-7.
4. Quoted amount of tender beyond 10% above/less than official estimated cost will be Non- Responsive as per E-GP guidelines.
5. The site of protective works has not been acquired land of BWDB. No claim or compensation shall be entertained in this connection.
6. Payments of executed work will be made upon availability of funds. Any claim for the late payments/delay of works will not be entertained.
7. The Contractor shall keep records of still and video pictures of the works before start of work and after completion of works maintaining same angle of pictures at his own cost.
8. After completion of the tender opening process, if important documents/certificates related to tender evaluation are unavailable to download/unclear/without JV percentage/other important informations, the certificate would not be taken into consideration.
9. The contractor shall execute tests (cylinder test/core cutting test/polypropylene content etc.) by his own cost.
|
1. All the tenderers must be registered with e-GP portal through CPTU.
2. Tenderer should fulfill all criteria's which are stated in TDS.
3. Tenderer should submit their credit line facility/Liquid assets certificate according to Form PW3-7.
4. Quoted amount of tender beyond 10% above/less than official estimated cost will be Non- Responsive as per E-GP guidelines.
5. The site of protective works has not been acquired land of BWDB. No claim or compensation shall be entertained in this connection.
6. Payments of executed work will be made upon availability of funds. Any claim for the late payments/delay of works will not be entertained.
7. The Contractor shall keep records of still and video pictures of the works before start of work and after completion of works maintaining same angle of pictures at his own cost.
8. After completion of the tender opening process, if important documents/certificates related to tender evaluation are unavailable to download/unclear/without JV percentage/other important informations, the certificate would not be taken into consideration.
9. The contractor shall execute tests (cylinder test/core cutting test/polypropylene content etc.) by his own cost.
|
| TDS/PDS--C. Qualification Criteria--
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (five) years.
[years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last [5] years, each with a value of at least Tk. 9.00 lac (Nine lac) only . [years counting backward from the date of publication of IFT in the newspaper] |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (five) years.
[years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last [5] years, each with a value of at least Tk. 900.00 lac (Nine Hundred lac) only. [years counting backward from the date of publication of IFT in the newspaper]
|
| Brief Description of Goods,Works or Service
|
Package No.: Bagmoyna/ W-1
Protective work along the Right Bank of Kushiyara River from km 58.200 to km 58.500 = 300 m at Bagmoyna in Raniganj Union of Upazila-Jagannathpur of District-Sunamganj under Sunamganj O&M Division-2, BWDB, Sunamganj.
|
Package No.: Bagmoyna/ W-1
Protective work along the Right Bank of Kushiyara River from km 58.200 to km 58.500 = 300 m at Bagmoyna in Raniganj Union of Upazila-Jagannathpur of District-Sunamganj under Sunamganj O&M Division-2, BWDB, Sunamganj.
|