Asper PPR and PPA last amendment, TDS, PCC.
Installation of 234 Nos Shallow Tara System Tube-well with 6No Hand Pump (Non extractable) at Sadar Upazila of Joypurhat District under the Project for Safe Water Supply Throughout the Country (PSWSC) during FY (2023-2024).