View IFT /PQ / REOI / RFP / PPS Notice Details
Amendment / Corrigendum Detail
|
Amendment / Corrigendum No. : 1
|
| Amendment / Corrigendum Text : |
Due to Slow Internet Problem |
| Field Name |
Old Value |
New Value |
| Document last selling date & time
|
26/11/2023 16:00 |
10/12/2023 16:00 |
| Eligibility of Consultant
|
-
As Per ITT & TDS &
-
01." Letter of Commitment for Bank’s undertaking for Line of Credit (Form PW3-7)" This Form should be used for Liquid Asset and Issuing Date must be before the submission of tender and bank statement is not allowed.
-
02. Tenderer must submit the Declaration letter of 0% progress/ no pending work in his/her firm pad with date, seal, and signature.
-
03. According to letter no-03.074.039.16.00.004.2018-377 dt.30/08/2018 from office of the Prime Minister, the contractor who has not completed his/her work/works within schedule stipulated time by ensuring the quality without any acceptable reason, will not be considered as a qualified tenderer for this tender notice.
-
04. The Bidders who have works pending which are not completed in due time without valid reason and the quality of works is not satisfactory then they will be non-responsive for this tender.
-
05. If any mistake/omission occurs in this tender will be corrected/included as per PPR-2008 and its amendment and no claim in this regard will be entertained.
-
06. The tenderer shall maintain highest ethics in providing all type documents.
-
07. If corrupt, fraudulent, collusive, coercive or obstruction practices of any kind is determined against any tenderer, the measures shall be taken as per ITT clause 4 of STD.
-
08. Construction Turnover will calculate aggregately (cumulatively) for all ID on this IFT
|
-
As Per ITT & TDS &
-
01." Letter of Commitment for Bank’s undertaking for Line of Credit (Form PW3-7)" This Form should be used for Liquid Asset and Issuing Date must be before the submission of tender and bank statement is not allowed.
-
02. Tenderer must submit the Declaration letter of 0% progress/ no pending work in his/her firm pad with date, seal, and signature.
-
03. According to letter no-03.074.039.16.00.004.2018-377 dt.30/08/2018 from office of the Prime Minister, the contractor who has not completed his/her work/works within schedule stipulated time by ensuring the quality without any acceptable reason, will not be considered as a qualified tenderer for this tender notice.
-
04. The Bidders who have works pending which are not completed in due time without valid reason and the quality of works is not satisfactory then they will be non-responsive for this tender.
-
05. If any mistake/omission occurs in this tender will be corrected/included as per PPR-2008 and its amendment and no claim in this regard will be entertained.
-
06. The tenderer shall maintain highest ethics in providing all type documents.
-
07. If corrupt, fraudulent, collusive, coercive or obstruction practices of any kind is determined against any tenderer, the measures shall be taken as per ITT clause 4 of STD.
-
08. Construction Turnover will calculate aggregately (cumulatively) for all ID on this IFT
|
| Opening Date & Time
|
27/11/2023 12:00 |
11/12/2023 12:00 |
| Last date & time for Tender/Proposal Security Submission
|
26/11/2023 17:00 |
10/12/2023 17:00 |
| Closing Date & Time
|
27/11/2023 12:00 |
11/12/2023 12:00 |
| Brief Description of Goods,Works or Service
|
FOSEP/Clg-W01: CONSTRUCTION OF 6-STORIED ACADEMIC BUILDING WITH 6-STORED FOUNDATION OF COLLEGE BUILDING AT GOVT. HAZI MUHAMMAD MOHSIN COLLEGE, SADAR, CHATTOGRAM. [ Type A4-06 (Shallow Foundation) ]
|
FOSEP/Clg-W01: CONSTRUCTION OF 6-STORIED ACADEMIC BUILDING WITH 6-STORED FOUNDATION OF COLLEGE BUILDING AT GOVT. HAZI MUHAMMAD MOHSIN COLLEGE, SADAR, CHATTOGRAM. [ Type A4-06 (Shallow Foundation) ]
|