View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Correction in Qualification Criteria of TDS |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 08/11/2023 16:00 | 12/11/2023 16:00 |
| Eligibility of Consultant | 1. All the tenderers/firms must be registered with CPTU through the e-GP portal. 2. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instructions for Tenderer: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work. 2. Only the certificates issuing from concern PE with detail information (such as; Name of the work, executed value, duration of work, official memo no. with date) will be accepted for specific experience. 3. All non-life insurance for any Public Property, or risks or liabilities pertaining to Public Property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019. 6. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of the Executive Engineer. 7. The cost of all tests (compressive strength, materials test etc.) should be carried by the Contractor himself. 8. The clear instruction for all tenderer that "Payment will be made after availability of fund and approval of budget."
1. All the tenderers/firms must be registered with CPTU through the e-GP portal.
2. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization.
Special Instructions for Tenderer:
1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work.
2. Only the certificates issuing from concern PE with detail information (such as; Name of the work, executed value, duration of work, official memo no. with date) will be accepted for specific experience.
3. All non-life insurance for any Public Property, or risks or liabilities pertaining to Public Property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019.
6. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of the Executive Engineer.
7. The cost of all tests (compressive strength, materials test etc.) should be carried by the Contractor himself.
8. The clear instruction for all tenderer that "Payment will be made after availability of fund and approval of budget." | |
| Opening Date & Time | 09/11/2023 12:25 | 13/11/2023 12:25 |
| Last date & time for Tender/Proposal Security Submission | 09/11/2023 11:00 | 13/11/2023 11:00 |
| Closing Date & Time | 09/11/2023 12:25 | 13/11/2023 12:25 |
| TDS/PDS--C. Qualification Criteria-- | (a) The minimum number of years of general experience of the Tenderer as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years counting backward from the date of publication of IFT in the newspaper (b) The minimum specific experience as a Prime Contractor in construction works of at least 1 (One) contract of similar nature successfully completed within the last 5 (Five) years, each with a value of at least Tk. 1700.00 lacs (One Thousand Seven Hundred Lacs). Similiar Nature of Work: Construction/ Repair of revetment/ River bank protection work/ Shore protection work/ Groyne/ Spur. |
(a) The minimum number of years of general experience of the Tenderer as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years counting backward from the date of publication of IFT in the newspaper (b) The minimum specific experience as a Prime Contractor in construction works of at least 1 (One) contract of similar nature successfully completed within the last 5 (Five) years, each with a value of at least Tk. 1500.00 lacs (One Thousand Five Hundred Lacs). Similiar Nature of Work: Construction/ Repair of revetment/ River bank protection work/ Shore protection work/ Groyne/ Spur. |
| Brief Description of Goods,Works or Service | Bank Protection Work along the Left Bank of Karnafuli river at West Sarafvata area from Km. 0.000 to Km.0.150 = 150.00m, Right Bank at Betagi Goongunia area from Km. 0.000 to Km.0.330 = 330.00m , at Betagi Khawkhali Primary School area from Km. 0.000 to Km.0.100 = 100.00m, Right Bank at Bachababa Majar Upstrem Jelepara area Km. 0.000 to Km.0.120 = 120.00m, Right Bank at Betagi Khawkhali 8no Word Bashor Master area from Km. 0.000 to Km.0.150 = 150.00m; Total = 850.00m under Rangamati O&M Division, BWDB, Kaptai during the year 2023-24. (PR-21/ADP/2023-24) |
Bank Protection Work along the Left Bank of Karnafuli river at West Sarafvata area from Km. 0.000 to Km.0.150 = 150.00m, Right Bank at Betagi Goongunia area from Km. 0.000 to Km.0.330 = 330.00m , at Betagi Khawkhali Primary School area from Km. 0.000 to Km.0.100 = 100.00m, Right Bank at Bachababa Majar Upstrem Jelepara area Km. 0.000 to Km.0.120 = 120.00m, Right Bank at Betagi Khawkhali 8no Word Bashor Master area from Km. 0.000 to Km.0.150 = 150.00m; Total = 850.00m under Rangamati O&M Division, BWDB, Kaptai during the year 2023-24. (PR-21/ADP/2023-24) |