1. Tenderer must be registered on e-GP Portal with a valid trade license, TIN Certificate. 2. Tenderer must submit similar nature work certificate,annual construction turnover certificate and liquid assets certificate 3. Payment will be made after availability of fund. 4. Any individual Tender/Bangladeshi Tenderer(s)/firm(s) who fulfill the qualification(s) criteria stipulated in the Tender Document PPA-2006 and PPR-2008. 5. Tenderer must submit line of credit certificate in PW3-7 prescribed format which is to be uploaded in section 8.Strictly, Credit commitment(s) substantiated by any scheduled bank of Bangladesh in the specified format (PW3-7) without alteration, issued not earlier than 28 days prior to the day of the original deadline for submission of the tender will be accepted. The format also uploaded at Section 8 of the Tender Document of this tender. 6. All the information,clarification and documents submitted by the tenderer must comply with declaration given. 7. Tenderer shall own or have proven access to hire or lease of the major construction equpments, in full working order (required documents must be submitted). 8. Work Order will be issued after getting approval from competant authority. 9.The alignment of dredging may be shifted and volume of work may be changed as per field condition(Direction and Volume of river flow, Development of land along the river etc.) before on during implementation of work. 10.Tenderer shall own or have proven access to hire or lease of the major construction equpments, in full working order (required documents must be submitted).
Dredging of Char on the right bank of Madhumati River from Km. 100.000 to Km. 101.500 = 1.500 km at West Salamatpur c/w " Bank protective works along the left bank of Madhumati river to protect the connecting road to Shahid Birsreshtho Munshi Abdur Rouf Smriti Museum including other areas and dredging project" in Upzallia- Madhukhali District- Faridpur Under Faridpur O & M Division, BWDB, Faridpur During the FY 2023-24 & 2024-25.