| Brief Description of Works : |
LGED/SSWRDP-2/BD-P98/2023-2024/35249-Structure
Package No-02: (a) Construction of Buried Pipe Network System (Branch Pipe Line ( 1-5/1,L=200m), (BPL-1-6,L=500m),(BPL-1-6/1,L=125m),(BPL-1-7,L=125m),(BPL-1-8,L=400m),(BPL-1-9,L=100m),(BPL-2-1,L=100m),(BPL-2-2/1/1,L=175m),(BPL-2-2/2,L=375m),(BPL-2-4/1,L=100m),(BPL-2-7/1,L=184m),(BPL-2-8,L=275m),(BPL-2-9,L+250m),(BPL-2-10,L=220m), Total=3129m Including 2 pumps, Repairing Riser (10 Nos) , Alfa Alfa Valve (6 Nos) and Installation of gate Valve (3 Nos), (b) Construction of Agribusiness Centre and Field Access BC Road-1 From Ch.0+000Km to Ch.1+545 Km, (c) Construction of Agribusiness Centre and Field Access BC Road-2 From Ch.0+000 Km to Ch.0+435 Km, (d) Construction of Agribusiness Centre and Field Access BC Road-3 From Ch.0+000 Km to Ch.0+150 Km, (e) Construction of Box culvert-1(1V-1.8m x 1.7m) at Ch.0+338Km of Road-1, (f) Construction of Box Culvert-2 (1V-1.8m x1.7m) at Ch.1+207Km of Road-1, (g) Construction of Box Culvert-3 (1V-1.8m x1.7m) at Ch.1+400Km of Road-1, (h) Construction of Box Culvert-4 (1V-1.8mx1.7m) at Ch.0+194 Km of Road-2, (i) Construction of Retaining Wall, River Ghat and Platform for pump Operation, (j) Construction of Repairing Header Tank, (k) Construction of Sub-project Indentification Signboard of Dogachhia Sub-Project (SP ID-35249) Under Upazila: Gafargaon, District: Mymensingh.
|