View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Modification in paper required |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 19/11/2023 16:49 | 23/11/2023 16:49 |
| Eligibility of Consultant |
Tenderer must submit the following additional documents: |
Tenderer must submit the following additional documents: |
| Opening Date & Time | 20/11/2023 10:20 | 26/11/2023 10:21 |
| Last date & time for Tender/Proposal Security Submission | 19/11/2023 17:00 | 23/11/2023 17:00 |
| Closing Date & Time | 20/11/2023 10:20 | 26/11/2023 10:21 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Modification in BOQ |
| Field Name | Old Value | New Value |
|---|---|---|
| PCC--.-- | The PE is [insert complete name of the PE]. |
The PE is |
| PCC--.-- | The site(s)/ point(s) of delivery is/are: [ insert name(s) and detailed information on the location(s) of the site(s)] |
The site(s)/ point(s) of delivery is/are: In 165 Upozillas of 63 district within RMCIP Project area including haor and hilly upozillas excluding Borguna District. |
| PCC--.-- |
For notices, the PE’s contact details shall be: |
For notices, the PE’s contact details shall be:
For notices, the Supplier’s contact details shall be: |
| PCC--.-- | The scope of Supply shall be defined in: [insert “section 6, Schedule of Supply” ] or [At the time of awarding the Contract, the PE shall specify any change in the Scope of Supply with respect to Section 6, Schedule of supply included in the E-TD. Such changes may be due, for instance, if the quantities of goods and related Services are increased or decreased at time of award] |
The scope of Supply shall be defined in: section 6, Schedule of Supply and in Specification Required (attached). |
| PCC--.-- | The packing, marking and documentation within and outside the packages shall be: [insert in detail the type of packing required, the markings in the packing and all documentation required]
The outer packing may be clearly marked on at least four slides as follows: |
The packing, marking and documentation within and outside the packages shall be: BADC |
| PCC--.-- |
The documents to be furnished by the Supplier shall be as follows: |
The documents to be furnished by the Supplier shall be as follows:
The documents to be furnished by the Supplier as follows:
[Note: The above requirements should be reviewed by a PE on a case-by-case basis, with amendments being made as necessary.] |
| PCC--.-- | The Contract price is: [insert the contract Price] |
The Contract price is: As per NOA |
| PCC--.-- | The Prices charged for the Goods supplied and the Related services performed [insert “shall” or “shall not”, as appropriate] be adjustable.
If prices are adjustable, the following method shall be used to calculate the price adjustment [see attachment to these PCC for a sample Price Adjustment Formula] |
The Prices charged for the Goods supplied and the Related services performed shall not be adjustable. |
| PCC--.-- |
The payment-delay period after which the PE shall pay interest to the supplier shall be [Indicate the days] days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it.
The interest rate that shall be applied is [ %] percent |
The payment-delay period after which the PE shall pay interest to the supplier shall be 365 days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it. |
| PCC--.-- | The method and conditions of payment to be made to the Supplier under this Contract shall be as follows:
(a) Advance Payment: [usually ten (10)] percent of the Contract Price shall be paid within thirty (30) days of signing of the Contract, and upon submission of claim and a bank guarantee for equivalent amount valid until the Goods are delivered and in the form provided in the E-TD (PG3-10). |
The method and conditions of payment to be made to the Supplier under this Contract shall be as follows: |
| PCC--.-- |
Payments shall be made in no case later than the days [Indicate the days] after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it. |
Payments shall be made in no case later than the days 365 days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it subject to available budget and fund. |
| PCC--.-- |
The inspections and tests shall be :[ insert type of test, time, place, procedures for carrying out the inspections and tests
[Note: Depending on the type of Goods to be procured, there may be a need to provide for special inspections and/or tests to be carried out. In particular, this will be the case when the Goods are designed specifically for the purpose of the Project in question or where due to the nature of the Goods, there is a need to ensure compliance with certain technical specifications and requirements at an early stage. If there is a need for such special inspections and/or tests, the PCC should mention specific testing methods and the timing or milestones and places where the tests and/or inspections are to be carried out. ] |
The inspections and tests shall be: Standard for such type of goods. Type of test: Visual Inspection, Performance test. Time or milestone: At inspection. Place: Manufacturer Company |
| PCC--.-- | The period of validity of the Warranty shall be : [ insert the period of validity of the warranty] |
The period of validity of the Warranty shall be : as BOQ |
| PCC--.-- | The Supplier shall correct any defects covered by the Warranty within [insert period, i.e. number of days] of being notified by the PE of the occurrence of such defects. |
The Supplier shall correct any defects covered by the Warranty within 15 days of being notified by the PE of the occurrence of such defects. |
| PCC--.-- | The amount of Liquidated Damages is [insert between 0.05 and 0.10] of ONE (1) percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay.
Guide to application of GCC Sub Clause 35.1 above
The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is [insert ≤ ten (10)] percent of the final Contract Price of the whole of the Goods and related services.
|
The amount of Liquidated Damages is 5 percent of ONE (1) percent of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay.
The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is 5 percent of the final Contract Price of the whole of the Goods and related services. |
| PCC--.-- | Arbitration shall take place in: [insert the name of the Place and addresses] |
Arbitration shall take place in: Chief Engineer (Construction), BADC, Dhaka |
| PCC--.-- |
The name of the Adjudicator[insert the name of the Adjudicator] |
The name of the Adjudicator: MD (Irrigation), BADC, Dhaka |
| PCC--.-- | The following documents shall also be part of the Contract: [insert the name of the documents] |
The following documents shall also be part of the Contract: Delvery location |
| TDS/PDS--A. General-- | The PE is :[state name of PE]
The number, identification and name of lots comprising the Tender are:
[state number, list the lots and related Goods with identification] |
The PE is The Name and identification number of Tender are :Purchase of Furniture Lot-2 under Renovation Modernization & Construction of Office Buildings & Infrastructures of BADC Project jurisdiction
The number, identification and name of lots comprising the Tender are:Purchase of Furniture Lot-2 under Renovation Modernization & Construction of Office Buildings & Infrastructures of BADC Project jurisdiction |
| TDS/PDS--A. General-- | The source of public fund is [state source, GoB or other source of funds]. |
The source of public fund is GoB |
| TDS/PDS--A. General-- | The name of the Development Partner is [state name of Development Partner] |
The name of the Development Partner is : NA |
| TDS/PDS--A. General-- | Tenderers from the following countries are not eligible: [state the name of countries] |
Tenderers from the following countries are not eligible: Israel |
| TDS/PDS--A. General-- | Goods and related Services from the following counties are not eligible: [state the name of countries] |
Goods and related Services from the following counties are not eligible: Israel |
| TDS/PDS--B. e-Tender Document-- | Allowed to post clarification till [Date and Time] |
Allowed to post clarification till: NA |
| TDS/PDS--B. e-Tender Document-- | A Pre- Tender meeting shall not be held.
The Pre- Tender meeting shall be held through e-GP System. |
The Pre- Tender meeting shall be held through e-GP System. |
| TDS/PDS--B. e-Tender Document-- | Pre- Tender meeting [Date & Time] |
Pre- Tender meeting : As tender notice |
| TDS/PDS--C. Qualification Criteria-- | The satisfactory completion of supply of similar Goods of minimum [state value] under maximum [state number] contracts in the last [state number] of years. i.e. years counting backward from the date of publication of IFT in the e-GP System The minimum specific experience as Supplier in supply of similar Goods of at least [state number] contract(s) successfully completed within the last [state number] years, each with a value of at least Tk. [state amount].
[the minimum number of contracts will depend upon the size and type of supply of goods, and the Procuring Entity should make its own judgement based upon its experience in the supply sector. For example, for large supply, it could be two (2) contract of similar nature during the last three (3) years or five (5) (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper] |
The minimum specific experience as the satisfactory completion of supply of similar Goods of minimum tk 21.0 Lac under maximum 1 contract in the last 3 years using public fund. i.e. years counting backward from the date of publication of IFT in the e-GP System. |
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets i.e. working capital or credit line(s), net of other contractual commitments is Tk. [state value] |
The minimum amount of liquid assets i.e. working capital or credit line(s), net of other contractual commitments is Tk. 25.0 Lac |
| TDS/PDS--D. Tender Preparation-- | The Tenderer shall submit with its e-Tender the following additional documents:
|
The Tenderer shall submit with its e-Tender the following additional documents:
1. A Valid update Trade License. |
| TDS/PDS--D. Tender Preparation-- |
Tenders are being invited for [state single lot] |
Tenders are being invited for single lot |
| TDS/PDS--D. Tender Preparation-- | After sales service is: [state “required” or “ not required”] |
After sales service is: required |
| TDS/PDS--D. Tender Preparation-- |
Manufacturer’s authorization is: [State “required” or “not required”]
|
Manufacturer’s authorization is: required |
| TDS/PDS--D. Tender Preparation-- | The Tender validity period shall be [sate days] days.
|
The Tender validity period shall be 120 days. |
| TDS/PDS--D. Tender Preparation-- | The amount of the Tender Security shall be [ state amount ]
|
The amount of the Tender Security shall be :as tender notice |
| TDS/PDS--D. Tender Preparation-- | The Tender security at the percentage [state percentage]
|
The Tender security at the percentage :as tender notice |
| TDS/PDS--E. Tender Submission-- | The deadline for lodgement of e-Tenders is [state time, and identify a.m or p.m, i.e 10.30 a.m]
|
The deadline for lodgement of e-Tenders is :as tender notice |
| TDS/PDS--G. Contract Award-- |
The maximum percentage by which quantities per item may be increased is [state percentage]. |
The maximum percentage by which quantities per item may be increased is 20 %. (Nearest upper whole number) |
| TDS/PDS--G. Contract Award-- |
The amount of Performance Security shall be ten [ state percentage] percent of the Contract Price. |
The amount of Performance Security shall be ten percent of the Contract Price. |
| Tender/Proposal Security (Amount in BDT)(Lot No : 1) | 60000.0 | 62000 |