View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to Unavoidable circumstances this corrigemdum has been issued |
| Field Name | Old Value | New Value | ||||
|---|---|---|---|---|---|---|
| Eligibility of Consultant | 1) Valid Trade Licence, TIN number, VAT Registration, Nationality, & Business address, Declaration about legal capacity to enter in to the contract. 6) The concern contractor will have to arrange the required land for construction works by consulting with the local union chairman and owner of the land. The concern contractor cannot claim any additional compensation in this connection and if so; his claim will not be admissible. 7) Latest circular of CPTU and BWDB shall be implied. 8) After completion of the tender opening process, only downloaded documents of the tenderer from egp portal shall be treated as submitted documents. 9) The Contractor shall keep records of still pictures and videos of Pre-work, Ongoing work and Post work/Completion of work at his own cost. |
1) Valid Trade Licence, TIN number, VAT Registration, Nationality, & Business address, Declaration about legal capacity to enter in to the contract. 6) The concern contractor will have to arrange the required land for construction works by consulting with the local union chairman and owner of the land. The concern contractor cannot claim any additional compensation in this connection and if so; his claim will not be admissible. 7) Latest circular of CPTU and BWDB shall be implied. 8) After completion of the tender opening process, only downloaded documents of the tenderer from egp portal shall be treated as submitted documents. 9) The Contractor shall keep records of still pictures and videos of Pre-work, Ongoing work and Post work/Completion of work at his own cost. |
||||
| PCC--D. Cost Control-- |
The following additional events shall also be the Compensation Events: |
The following additional events shall also be the Compensation Events: |
||||
| PCC--D. Cost Control-- | The proportion of payments to be retained is [insert percent] percent. |
The proportion of payments to be retained is 5.00 percent. |
||||
| PCC--D. Cost Control-- |
The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay. |
The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is 0.10 of ONE (1) percent of its Contract price per day of delay.] |
||||
| PCC--D. Cost Control-- |
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works. |
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is 10.00 percent of the final Contract price of the whole of the Works. |
||||
| PCC--F. Termination-- | The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is [state percentage] percent.
[ usually between ten (10) to twenty (20) percent depending on the nature of the Works] |
The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 10.00 percent. |
||||
| PCC--H. Disputes and Settlement-- |
The arbitration shall be conducted in the place mentioned below; |
The arbitration shall be conducted in the place mentioned below; |
||||
| TDS/PDS--A. General-- |
|
|
||||
| TDS/PDS--B. Tender Document-- | Allowed to post clarification till [Date and Time] |
Allowed to post clarification till NA |
||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.
[ the required average annual construction turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)] |
The required average annual construction turnover shall be greater than Tk 32.00 Lac(Thirty Two Lac) over the last years.5(Five) years counting backward from the date of publication of IFT |
||||
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.] |
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 15.00 Lac(Fifteen Lac) |
||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be:[70%-80% of the official estimated cost]
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
The minimum capacity shall be:24.00 Lac(Twenty Four Lac ) |
||||
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of similar works of at least Tk [insert amount] under [state number] of contract(s) over a period of [state number] years shall be required. [the minimum value of the similar works under a single or multiple number of contract(s) is recommended to be between 50 and 75 percent of the estimated cost, rounded off to nearest Taka thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package] |
A satisfactory completion of similar works of at least Tk 22.00 lac(Twenty Lac) under single of contract(s) over a period of 5 years counting backward from the date of publication of IFT in the newspaper shall be required. Dredging of river/ channel/ khal etc. will be considered as similar Works. i.e On going works/current commitment certificate will not allowed for similar nature of works . |
||||
| TDS/PDS--D. Tender Preparation-- | Tenderer shall submit with its Tender, the following additional documents: |
Tenderer shall submit with its Tender, the following additional documents:
1. Valid Trade Licence. |
||||
| TDS/PDS--D. Tender Preparation-- | The Tender Validity period shall be [state number] days.
[normally 60 to 90 days deemed reasonable] |
The Tender Validity period shall be 90 days |
||||
| TDS/PDS--D. Tender Preparation-- |
The amount of the Tender Security shall be [ state amount ] |
The amount of the Tender Security shall be as stated in IFT. |
||||
| TDS/PDS--E. e-Tender Submission-- |
The deadline for lodgment of e-Tenders is [state time, and identify AM or PM e.g 10.30 a.m] |
The deadline for lodgment of e-Tenders is as stated in IFT with latest amendment. |
||||
| Brief Description of Goods,Works or Service | ADB/OTM/Netra/W-22/2022-23 |
ADB/OTM/Netra/W-22/2022-23 |