Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to unavoidable circumstances |
| Field Name | Old Value | New Value | ||||
|---|---|---|---|---|---|---|
| Eligibility of Consultant | As per TDS |
As per TDS |
||||
| PCC--A. General-- |
The Procuring Entity is |
The Procuring Entity is
The Executive Engineer Phone: 0259-941088 e-mail: xen.panchagarh@lged.gov.bd |
||||
| PCC--A. General-- |
The Project Manager is |
The Project Manager is Upazila Engineer, LGED, Upazila: Tetulia, District: Panchagarh |
||||
| PCC--A. General-- |
The Site is located at [location] and is defined in drawings No: |
The Site is located at Upazila: Tetulia, District: Panchagarh |
||||
| PCC--A. General-- |
The Works consist of |
The Works consist of Improvement of Bamon Para R&H-Bhajanpur Madrasa Road at Ch. 00-2500.00m [Road ID: 177904026] under Tetulia Upazila, District: Panchagarh [GDDRIDP/PAN/TET/VRA/45] |
||||
| PCC--A. General-- | Other documents forming part of the Contract are;
[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.] |
Other documents forming part of the Contract are;
STD |
||||
| PCC--A. General-- | Possession of the Site to the Contractor shall be given on the following date;
[state date of possession of site] |
Possession of the Site to the Contractor shall be given on the following date; Within 07 (Seven) days of signing the Contract Agreement |
||||
| PCC--B. Time Control-- |
The Start Date shall be [insert date ] |
The Start Date shall be within 07 (Seven) Days after signing of Contract |
||||
| PCC--B. Time Control-- |
The Intended Completion Date for the whole of the Works shall be [insert date] |
The Intended Completion Date for the whole of the Works shall be as stated as e-Tender Notice |
||||
| PCC--B. Time Control-- |
The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract. |
The Contractor shall submit a Programme for the Works within ten (10) days of signing the Contract |
||||
| PCC--C. Quality Control-- |
The Defects Liability Period is [state months] |
The Defects Liability Period is twelve (12) months |
||||
| PCC--D. Cost Control-- |
The following additional events shall also be the Compensation Events: |
The following additional events shall also be the Compensation Events: |
||||
| PCC--D. Cost Control-- | The proportion of payments to be retained is [insert percent] percent. |
The proportion of payments to be retained is 05 (Five) percent |
||||
| PCC--D. Cost Control-- |
The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay. |
The amount of Liquidated Damages or in other words Delay Damages is 0.05 [Zero Point Zero Five] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
Guide to application of GCC Sub Clause 28.1 above |
||||
| PCC--D. Cost Control-- |
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works. |
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is ten (10) percent of the final Contract price of the whole of the Works. |
||||
| PCC--F. Termination-- | The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is [state percentage] percent.
[ usually between ten (10) to twenty (20) percent depending on the nature of the Works] |
The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is ten (10) percent. |
||||
| PCC--H. Disputes and Settlement-- |
The arbitration shall be conducted in the place mentioned below; |
The arbitration shall be conducted in the place mentioned below; |
||||
| TDS/PDS--A. General-- |
|
|
||||
| TDS/PDS--B. Tender Document-- | Allowed to post clarification till [Date and Time] |
Allowed to post clarification till N/A |
||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.
[ the required average annual construction turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)] |
a) The required average annual construction turnover i.e total certified payments received for contracts in progress or completed under public sector from respective procuring entity shall be greater than BDT. 2,65,00,000.00 [Two Crore Sixty Five Lakh only] over the last 05 (Five) years.
-Payment received Certificates for construction works Issued by relevant procuring entity (ies) will be considered as construction turnover. Payment as Sub-Contractor |
||||
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.] |
(b) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 66,00,000.00 [Sixty Six Lakh] only. NOTE : Supporting necessary documents required are as follows: - Liquid Assets : authenticated by day end bank statement, from any scheduled bank; or - Working capital : authenticated by recent past Audit Reports; or - Credit facilities: authenticated by credit sanctioned letter and bank statement of the credit account; or - Credit line: authenticated by any scheduled bank shall be furnished without alternation in accordance with the format as specified in the Form PW2a-3" Letter of Commitment for Banks Undertaking for Line of Credit", should be download from section 7 of the Tender Document. Note : 1. Bank Statement, statement of Credit Facilities and Line of Credit must be issued not earlier than 28 (Twenty Eight) days prior to the day of the original deadline for submission of Tenders for this Contract. 2. Audit Reports (Audited balanced sheet) should not be earliar than FY : 2021-22 |
||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be:[70%-80% of the official estimated cost]
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
(c) The minimum capacity shall be: Tk 1,90,00,000.00 [One Crore Ninety Lakh] only.
The following formulae shall be used to calculate the Tender Capacity
Where For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
||||
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of similar works of at least Tk [insert amount] under [state number] of contract(s) over a period of [state number] years shall be required. [the minimum value of the similar works under a single or multiple number of contract(s) is recommended to be between 50 and 75 percent of the estimated cost, rounded off to nearest Taka thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package] |
The Minimum specific experience as a prime contractor in construction works under public sector of at least 01(One) contract of of similar nature complexity and methods/construction technology successfully completed within the last 5 (Five) years, each with a value of at least Tk 1,90,00,000.00 [One Crore Ninety Lakh Only] |
||||
| TDS/PDS--D. Tender Preparation-- | Tenderer shall submit with its Tender, the following additional documents: |
Tenderer shall submit with its Tender, the following additional documents: |
||||
| TDS/PDS--D. Tender Preparation-- | The Tender Validity period shall be [state number] days.
[normally 60 to 90 days deemed reasonable] |
The Tender Validity period shall be 120 days. |
||||
| TDS/PDS--D. Tender Preparation-- |
The amount of the Tender Security shall be [ state amount ] |
The amount of the Tender Security shall be stated as e-Tender Notice |
||||
| TDS/PDS--E. e-Tender Submission-- |
The deadline for lodgment of e-Tenders is [state time, and identify AM or PM e.g 10.30 a.m] |
The deadline for lodgement of e-Tenders is as stated as e-Tender Notice |
||||
| Brief Description of Goods,Works or Service | Improvement of Bamon Para R&H-Bhajanpur Madrasa Road at Ch. 00-2500.00m [Road ID: 177904026] under Tetulia Upazila, District: Panchagarh [GDDRIDP/PAN/TET/VRA/45] |
Improvement of Bamon Para R&H-Bhajanpur Madrasa Road at Ch. 00-2500.00m [Road ID: 177904026] under Tetulia Upazila, District: Panchagarh [GDDRIDP/PAN/TET/VRA/45] |