a) Tenderer must be registered in the e-GP portal through CPTU along with valid and updated Trade License, VAT Registration and TIN certificate. b) It is the duty of contractor to submit all the documents freshly (without corrupted). If any documents get corrupted and evaluation committee could not be able to open the file, no claim from the tenderer will be entertained regarding the file. c) VAT & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard. d) Tender evaluation will be done following Standard Tender Documents. e) A detailed list of work in hand/on-going works duly signed by the tenderer must be submitted. f) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard. g) If BWDB owned/acquired land is not sufficient to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. h) Quantity and quality of work will be checked by BWDB's Task Force or any other competent authority. i) Photo and video must have to be taken by the contractor at a different angle during pre-work and post-work measurement and submitted to the PE. No extra claim will be entertained in this regard. j) All other criteria stated in the tender document. k) Payment will be made upon availability of budget/fund.
l)All Non-life insurance for any public property, or risks or liabilities pertaining to public property, shall be taken through Saddharon Bima Corporation in accordance with the Insurance Corporation Act, 2019
MBEP-08/2023-2024 Rehabilitation of Embankment from km 21.800 to km 29.400 = 7.600 km and Construction of Submersible Spur (15 nos), Drainage Structure (1-Vent), Drainage Outlet (1 no), Observatory Tower & Change Room and Installation of Solar Light (41 nos) at Polder no-58 in Monpura Upazila of Bhola District.