View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Amendment in TDS and PCC. |
| Field Name | Old Value | New Value |
|---|---|---|
| PCC--.-- | The PE is Chief Engineer
Address: Siddhirganj 2X120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj,
Telephone No.: 880-2-7691283 |
The PE is Chief Engineer
Address: Siddhirganj 2X120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj,
Telephone No.: 880-2-7691283 |
| PCC--.-- | The site/ point of delivery is/are: Siddhirganj 2X120 MW Peaking Power Plant Store, EGCB Ltd., Siddhirganj, Narayanganj-1430, Bangladesh. |
The site/ point of delivery is/are: Siddhirganj 2X120 MW Peaking Power Plant Store, EGCB Ltd., Siddhirganj, Narayanganj-1430, Bangladesh. |
| PCC--.-- |
For notices, the PEâ??s contact details shall be:
For notices, the Supplierâ??s contact details shall be: |
For notices, the PE’s contact details shall be:
For notices, the Supplier’s contact details shall be: |
| PCC--.-- | The scope of Supply shall be defined in:
For Installation, Testing & Commissioning of CCTV Surveillance system (4 Nos IR IP PTZ Domes Camera, 16 Nos IR IP Outdoor Camera, 1 No Network Video Recorder, 2 Nos CCTV Keyboard, 1 Nos CPU, 2 Nos Monitor, Related Network Switch, JB & Others required accessories install, required Cable laying for installing 20 Nos CCTV camera & Networking) for Siddhirganj 2x120 MW Peaking Power Plant. The Tenderer has to comply with the following terms & Conditions: XVII. The Tenderer has to arrange required tools & tackles for execution the works. XVIII. Lifting facility provided by EGCB.
|
The scope of Supply shall be defined in:
For Installation, Testing & Commissioning of CCTV Surveillance system (4 Nos IR IP PTZ Domes Camera, 16 Nos IR IP Outdoor Camera, 1 No Network Video Recorder, 2 Nos CCTV Keyboard, 1 Nos CPU, 2 Nos Monitor, Related Network Switch, JB & Others required accessories install, required Cable laying for installing 20 Nos CCTV camera & Networking) for Siddhirganj 2x120 MW Peaking Power Plant. The Tenderer has to comply with the following terms & Conditions: XVII. The Tenderer has to arrange required tools & tackles for execution the works. XVIII. Lifting facility provided by EGCB.
|
| PCC--.-- | The packing, marking and documentation within and outside the packages shall be: [insert in detail the type of packing required, the markings in the packing and all documentation required]
The outer packing may be clearly marked on at least four slides as follows: |
The packing, marking and documentation within and outside the packages shall be: [insert in detail the type of packing required, the markings in the packing and all documentation required]
The outer packing may be clearly marked on at least four slides as follows: |
| PCC--.-- |
The documents to be furnished by the Supplier shall be as follows:
e. Manufacturer’s/ Authorized Distributor’s Authorization Letter for the item 01-04 as specified in Price and Delivery Schedule for Goods (Form e-PG3-3A).
g. The supplier have to provide declaration that the product are new and unused supported with relevent document. |
The documents to be furnished by the Supplier shall be as follows:
e. Manufacturer's/ Authorized Distributor's Authorization Letter for the item 01-04 as specified in Price and Delivery Schedule for Goods (Form e-PG3-3A).
g. The supplier have to provide declaration that the product are new and unused supported with relevent document. |
| PCC--.-- | The Contract price is: Will be fixed during contract signing. |
The Contract price is: Will be fixed during contract signing. |
| PCC--.-- | The Prices charged for the Goods supplied and the Related services performed shall not be adjustable through out the contract. |
The Prices charged for the Goods supplied and the Related services performed shall not be adjustable through out the contract. |
| PCC--.-- | The method and conditions of payment to be made to the Supplier under this Contract shall be as follows: (a) Advance Payment:: Not Applicable. (b) Payment shall be made in BDT through A/c Payee cheque in favour of supplierâ??s Bank A/c in the following manner: i) On Delivery, R&I and Installation, Testing & Commissioning: Ninety percent (90%) of the Price of the delivered Goods and related services shall be paid upon submission of documents specified in GCC Clause 21.1 supported by the Receiving cum Inspection (R&I) Report issued by the consignee and work completion certificate issued by consignee after successfully installation, testing & commissioning of CCTV Surveillance system. ii) On Issuance of FAC: Payment of rest Ten percent (10%) of Goods delivered shall be made after warranty period against Final Acceptance Certificate (FAC) issued by the consignee after the expiry of warranty period. Note 1: All bills shall be certified by the concerned Executive Engineer and counter signed by Superintending Engineer (Maintenance) and Chief Engineer for payment. Note 2: VAT & AIT on payable amount shall be deducted from the bill as per prevailing rules and regulations of GOB |
The method and conditions of payment to be made to the Supplier under this Contract shall be as follows: (a) Advance Payment:: Not Applicable. (b) Payment shall be made in BDT through A/c Payee cheque in favour of supplier’s Bank A/c in the following manner: i) On Delivery, R&I and Installation, Testing & Commissioning: Ninety percent (90%) of the Price of the delivered Goods and related services shall be paid upon submission of documents specified in GCC Clause 21.1 supported by the Receiving cum Inspection (R&I) Report issued by the consignee and work completion certificate issued by consignee after successfully installation, testing & commissioning of CCTV Surveillance system. ii) On Issuance of FAC: Payment of rest Ten percent (10%) of Goods delivered shall be made after warranty period against Final Acceptance Certificate (FAC) issued by the consignee after the expiry of warranty period. Note 1: All bills shall be certified by the concerned Executive Engineer and counter signed by Superintending Engineer (Maintenance) and Chief Engineer for payment. Note 2: VAT & AIT on payable amount shall be deducted from the bill as per prevailing rules and regulations of GOB |
| PCC--.-- |
Payments shall be made in no case later than the days [Indicate the days] after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it: N/A. |
Payments shall be made in no case later than the days [Indicate the days] after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it: N/A. |
| PCC--.-- |
The payment-delay period after which the PE shall pay interest to the supplier shall be [Indicate the days] days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it: N/A. |
The payment-delay period after which the PE shall pay interest to the supplier shall be [Indicate the days] days after submission of an invoice or request for payment by the Supplier, and after the PE has accepted it: N/A |
| PCC--.-- | The inspections and tests shall be :
a) Post Landing Inspection shall be done after arrival of Goods at Siddhirganj 2X120 MW Peaking Power Plant Store. Post Landing Inspection shall be conducted by EGCBâ??s representative (Post
b) The Procuring Entity has the right to inspect, test and where necessary, reject the Goods arrived at store shall in no way be limited or waived by reason of the Goods having previously been tested c) Nothing in this clause shall in any way release the supplier from any warranty or other obligation under the provisions of the contract |
The inspections and tests shall be :
a) Post Landing Inspection shall be done after arrival of Goods at Siddhirganj 2X120 MW Peaking Power Plant Store. Post Landing Inspection shall be conducted by EGCB’s representative (Post
b) The Procuring Entity has the right to inspect, test and where necessary, reject the Goods arrived at store shall in no way be limited or waived by reason of the Goods having previously been tested c) Nothing in this clause shall in any way release the supplier from any warranty or other obligation under the provisions of the contract |
| PCC--.-- | The Supplier shall correct any defects covered by the Warranty within 21 (twenty one) days of being notified by the PE of the occurrence of such defects. |
The Supplier shall correct any defects covered by the Warranty within 21 (twenty one) days of being notified by the PE of the occurrence of such defects. |
| PCC--.-- | The period of validity of the Warranty shall be : Twelve (12) months from the date of successfully installation, testing & commissioning of CCTV surveillance system Issuance of work completion report by the consignee. |
The period of validity of the Warranty shall be : Twelve (12) months from the date of successfully installation, testing & commissioning of CCTV surveillance system Issuance of work completion report by the consignee. |
| PCC--.-- | Liquidated Damage: The amount of Liquidated Damages is Zero point one percent (0.1%) of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay. Guide to application of GCC Sub Clause 33.1 above [ Liquidated damages is equivalent to an amount to be determined in accordance with the following formulae: T = V x P x n
Where; The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is Ten percent (10%) of the final Contract Price of the whole of the Goods and related service. |
Liquidated Damage: The amount of Liquidated Damages is Zero point one percent (0.1%) of the contract value of the undelivered Goods or any part thereof delivered after expiry of the Delivery and Completion Schedule or extended Delivery and Completion Schedule, as applicable, per day of delay. Guide to application of GCC Sub Clause 33.1 above [ Liquidated damages is equivalent to an amount to be determined in accordance with the following formulae: T = V x P x n
Where; The maximum amount of Liquidated Damages for the undelivered Goods or any part thereof is Ten percent (10%) of the final Contract Price of the whole of the Goods and related service. |
| PCC--.-- | Arbitration shall take place in: Narayanganj, Bangladesh or Dhaka, Bangladesh. |
Arbitration shall take place in: Narayanganj, Bangladesh or Dhaka, Bangladesh. |
| PCC--.-- |
T(b) The arbitration shall be conducted in accordance with the Arbitration Act (Act No 1 of 2001) of Bangladesh as at present in force and in the place shown in the PCC. |
T(b) The arbitration shall be conducted in accordance with the Arbitration Act (Act No 1 of 2001) of Bangladesh as at present in force and in the place shown in the PCC. |
| PCC--.-- | The following documents shall also be part of the Contract: [insert the name of the documents]: N/A. |
The following documents shall also be part of the Contract: [insert the name of the documents]: N/A. |
| TDS/PDS--A. General-- | The PE is : Electricity Generation Company of Bangladesh (EGCB) Limited.
The Name and identification number of Tender are : 27.27.6758.207.03.001.17.0567, Date: 06.03.2017 The number, identification and name of lots comprising the Tender are: N/A. |
The PE is : Electricity Generation Company of Bangladesh (EGCB) Limited.
The Name and identification number of Tender are : 27.27.6758.207.03.001.17.0567, Date: 06.03.2017 The number, identification and name of lots comprising the Tender are: N/A. |
| TDS/PDS--A. General-- | The name of the Development Partner is [state name of Development Partner]: N/A. |
The name of the Development Partner is [state name of Development Partner]: N/A. |
| TDS/PDS--A. General-- | The source of public fund is [state source, GoB or other source of funds] : Own Found of EGCB Ltd. |
The source of public fund is [state source, GoB or other source of funds] : Own Found of EGCB Ltd. |
| TDS/PDS--A. General-- | Tenderers from the following countries are not eligible: Isreal |
Tenderers from the following countries are not eligible: Isreal |
| TDS/PDS--A. General-- | Goods and related Services from the following counties are not eligible: Isreal |
Goods and related Services from the following counties are not eligible: Isreal |
| TDS/PDS--B. e-Tender Document-- | Allowed to post clarification till [Date and Time]: As per tender notice. |
Allowed to post clarification till [Date and Time]: As per tender notice. |
| TDS/PDS--B. e-Tender Document-- |
The Pre- Tender meeting shall be held through e-GP System. |
The Pre- Tender meeting shall be held through e-GP System. |
| TDS/PDS--B. e-Tender Document-- | Pre- Tender meeting [Date & Time]: 23 March, 2017 14:00 Hr to 09 April, 2017 14:00 Hr. |
Pre- Tender meeting [Date & Time]: 23 March, 2017 14:00 Hr to 09 April, 2017 14:00 Hr. |
| TDS/PDS--C. Qualification Criteria-- | (a) The Tenderer shall have a minimum of 5 (Five) years of General experience in the supply of Goods and related services. (b) The minimum specific experience in supply and Installation, Testing & Commissioning of CCTV System at least 2 (Two) contract successfully completed within the last 5 (five) years, each with a value of at least Tk. 15,00,000.00 (Fifteen Lac). i.e. years counting backward from the date of publication of IFT in the e-GP System. (C) Authorization letter from Manufacturer / Authorized Distributor for the Item no. 01-04 as specified in Price and Delivery Schedule for Goods (Form e-PG3-3A).
|
(a) The Tenderer shall have a minimum of 5 (Five) years of General experience in the supply of Goods and related services. (b) The minimum specific experience in supply and Installation, Testing & Commissioning of CCTV System at least 2 (Two) contract successfully completed within the last 5 (five) years, each with a value of at least Tk. 15,00,000.00 (Fifteen Lac). i.e. years counting backward from the date of publication of IFT in the e-GP System. (C) Authorization letter from Manufacturer / Authorized Distributor for the Item no. 01-04 as specified in Price and Delivery Schedule for Goods (Form e-PG3-3A).
|
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid asset Tk. 25,00,000.00 (Twenty Five Lakh Taka) Only. |
The minimum amount of liquid asset Tk. 25,00,000.00 (Twenty Five Lakh Taka) Only. |
| TDS/PDS--D. Tender Preparation-- |
The Tenderer shall submit with its e-Tender the following additional documents:
d) Work completion certificate for supply and Installation, Testing & Commissioning of CCTV Surveillance System at least 2 (Two) contract successfully completed within the last 5 (five) years, each with a value of at least Tk. 15,00,000.00 (Fifteen Lac). Notifcation of Award (NOA) will not be accepted. f) Catalogue of the product from the manufacturer / Authorized Distributor. Supporting documents must be submitted by the tenderer. Otherwise tender will be considered as non-responsive. |
The Tenderer shall submit with its e-Tender the following additional documents:
d) Work completion certificate for supply and Installation, Testing & Commissioning of CCTV Surveillance System at least 2 (Two) contract successfully completed within the last 5 (five) years, each with a value of at least Tk. 15,00,000.00 (Fifteen Lac). Notifcation of Award (NOA) will not be accepted. f) Catalogue of the product from the manufacturer / Authorized Distributor. Supporting documents must be submitted by the tenderer. Otherwise tender will be considered as non-responsive. |
| TDS/PDS--D. Tender Preparation-- |
Tenders are being invited for Single Lot. |
Tenders are being invited for Single Lot. |
| TDS/PDS--D. Tender Preparation-- |
Manufacturer authorization is: Required.
Distributorâ??s Authorization Letter is also acceptable. In that case, Manufacturerâ??s Authorization against Distributor is required. |
Manufacturer authorization is: Required.
Distributor’s Authorization Letter is also acceptable. In that case, Manufacturer’s Authorization against Distributor is required. |
| TDS/PDS--D. Tender Preparation-- | After sales service is required. |
After sales service is required. |
| TDS/PDS--D. Tender Preparation-- | The Tender validity period shall be 120 days.
|
The Tender validity period shall be 120 days.
|
| TDS/PDS--D. Tender Preparation-- | The amount of the Tender Security shall be 70,000.00 (Seventy Thousand).
|
The amount of the Tender Security shall be 70,000.00 (Seventy Thousand).
|
| TDS/PDS--D. Tender Preparation-- | The Tender security at the percentage: as per ITT 29.2 of Tender data sheet.
|
The Tender security at the percentage: as per ITT 29.2 of Tender data sheet.
|
| TDS/PDS--E. Tender Submission-- | The deadline for lodgement of e-Tenders is 10 April, 2017 12:00 Hr
|
The deadline for lodgement of e-Tenders is 10 April, 2017 12:00 Hr
|
| TDS/PDS--G. Contract Award-- | The maximum percentage by which quantities per item may be increased is 15 % (Fifteen) Percentage. |
The maximum percentage by which quantities per item may be increased is 15 % (Fifteen) Percentage. |
| TDS/PDS--G. Contract Award-- | The amount of Performance Security shall be 10 (ten) percent of the Contract Price. |
The amount of Performance Security shall be 10 (ten) percent of the Contract Price. |