Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | need to correction. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 09/01/2024 17:00 | 15/01/2024 17:00 |
| Eligibility of Consultant | As per ITT & TDS 2.Tenderer must submit the Decleration letter of 0% progress/no pending work in his/her firm pad with date, sil and signature. 3.According to letter no-03.074.039.16.00.004.201837dt.30/08/2018from office of the Prime Minister, the contractor who has notcompletedhis/herwork/workswithin schedule stipulated time by ensuring thequality without any acceptable reason, will not be considered as aqualified tenderer for this tender notice. 4.The Bidders who have workspending which are not completed in due time without valid reason andthe quality of works is not satisfactory then they will be non-responsivefor this tender. 5. If any mistake/omission occurs in this tender will becorrected/included as per PPR-2008 ans its amendment and no claim inthis regard will be entertained. 6. The tenderer shall maintain highestethics in providing all type documents. 7. If corrupt, fraudulent,collusive, coercive or obstruction practics of any kind is determinedagainst any tenderer, the measures shall be taken as per ITT clause 4 ofSTD. |
1.As per ITT & TDS .3.According to letter no03.074.039.16.00.004.201837dt.30/08/2018from office of the Prime Minister, the contractor who has notcompletedhis/herwork/workswithin schedule stipulated time by ensuring thequality without any acceptable reason, will not be considered as aqualified tenderer for this tender notice.4.The Bidders who have workspending which are not completed in due time without valid reason andthe quality of works is not satisfactory then they will be non-responsivefor this tender.5. If any mistake/omission occurs in this tender will becorrected/included as per PPR-2008 ans its amendment and no claim inthis regard will be entertained.6.The tenderer shall maintain highestethics in providing all type documents.7. If corrupt, fraudulent,collusive, coercive or obstruction practics of any kind is determinedagainst any tenderer, the measures shall be taken as per ITT clause 4 ofSTD.(N.B: In case abnormal less or above in quoted price explanation reportmust be submitted through clarification during evaluation as perrequirement of TEC. If explanation report is not submitted properly by tenderer or explanation report is not acceptable to TEC, then tendererwill be non-responsive.Also tenderer working capacity or running workwill be consider during evaluation stage as per direction of PM office & CPTU, GOB (such as it is discouraged to getting more than one workfrom a single notice |
| Opening Date & Time | 10/01/2024 13:00 | 16/01/2024 13:00 |
| Last date & time for Tender/Proposal Security Submission | 10/01/2024 12:30 | 16/01/2024 12:30 |
| Closing Date & Time | 10/01/2024 13:00 | 16/01/2024 13:00 |
| Brief Description of Goods,Works or Service | Construction of 06- Storied Academic Building with 06- Storied Foundation with pile foundation in/c Sanitary, Water Supply & Electrification Works at Patuakhali Govt.Mohila college,UnderSadar Upazila, Patuakhali District., |
Construction of 06- Storied Academic Building with 06- Storied Foundation with pile foundation in/c Sanitary, Water Supply & Electrification Works at Patuakhali Govt.Mohila college,UnderSadar Upazila, Patuakhali District., |