1) All tenderer must be registered in e-gp portal system. 2) Payment will be made upon availability of fund; no claim will be entertained. 3) It is the tenderer's responsibility to submit all documents in their original form. If any documents become corrupted and the evaluation team is unable to open the file, no claim will be considered. 4) VAT & IT from bill will be deducted as per prevailing Government Rate. 5) If any type of Structure/Obstrucle is needed to dismantle to execute the work as per Design & Specification, the tenderer will do this at his own expense. No extra claims will be considered. 6) The tenderer must follow the latest instructions and formats of CPTU. 7) If BWDB owned land is not sufficient to execute the work as per design & Specification, the bidder will do this at his own expense and planning. 8) It is mandatory to submit video and still photographs of the said work in pre-work and post work condition to PE at contractor's own cost. 9) Quantity of work may extremely change and Design may also be modified. 10) Cost of pre work, interim and post-work survey will be borne by the contractor. 11) The work must be executed as per approved design uploaded at Sec-9 & technical specifications of BWDB uploaded at Sec-7of tender document.
12) The approved taskforce guideline uploaded at Sec-8 will be followed.
Sat-2/25 RIVER BANK PROTECTIVE WORK FROM KM. 22.865 TO KM. 23.215 = 350M ALONG THE RIGHT BANK OF SHAKBARIA RIVER AT KOYRA IN POLDER NO. 14/1; UPAZILA: KOYRA, DISTRICT- KHULNA, UNDER KHULNA O&M DIVISION-2, BWDB, KHULNA DURING THE YEAR 2023-24.