View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Civil Aviation & Tourism Division :
Organization : Civil Aviation Authority of Bangladesh Procuring Entity Name : Office of the Superintending Engineer, EM Circle-Project
Procuring Entity Code : Procuring Entity District : Dhaka
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : 30.31.0000.401.14.288.23.20602565 Date: 13-09-2023 Tender/Proposal Status :
App ID : 196365 Tender/Proposal ID : 916707
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Own Fund
Source of Funds : Own Fund
Particular Information :
Project Code : Not applicable Project Name : Not applicable
Tender/Proposal Package No. and Description : WD/100/EM-3/SAIA/2023-2024
Renovation of Power Distribution System of main power plant and different substations in/c related works at SAIA, Chattogram.
Category : Metal structures and parts of structures; Structural metal products; Electricity distribution and control apparatus; Insulated wire and cable; Electrical machinery, apparatus, equipment and consumables; Electrical parts of machinery or apparatus; Electrical supplies and accessories; Electrical equipment and apparatus;Electrical apparatus for switching or protecting electrical circuits;Electrical circuit components;Parts of electricity distribution or control apparatus;Mains;Power distribution cables;Coaxial cable;Insulated cable accessories;Electric conductors for data and control purposes
Scheduled Tender/Proposal Publication
Date and Time :
18-Dec-2023 09:00 Tender/Proposal Document last selling /
downloading Date and Time :
28-Jan-2024 15:00
Pre - Tender/Proposal meeting Start
Date and Time :
18-Dec-2023 10:00 Pre - Tender/Proposal meeting End
Date and Time :
21-Dec-2023 16:00
Tender/Proposal Closing
Date and Time :
29-Jan-2024 12:00 Tender/Proposal Opening
Date and Time :
29-Jan-2024 12:00
Last Date and Time for Tender/Proposal Security
Submission :
28-Jan-2024 16:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As per tender document

Brief Description of Works :

Renovation of Power Distribution System of main power plant and different substations in/c related works at SAIA, Chattogram.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 4000
Mode of Payment :
Tender/Proposal Security Valid Up to : 25-Jun-2024
Tender/Proposal Valid Up to : 28-May-2024
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
Single Lot Renovation of Power Distribution System of main power plant and different substations in/c related works at SAIA, Chattogram. SAIA, Chattogram 6000000 16-Apr-2024 15-Apr-2026
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Shuvasheesh Barua Designation of Official Inviting Tender/Proposal : Superintending Engineer (E/M)
Address of Official Inviting Tender/Proposal :
Address: Civil Aviation Authority of Bangladesh, Kurmitola, Dhaka-1229.
City: Dhaka
Thana: Dhaka North City Corporation
District: Dhaka - 1229
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 02-8901881
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  2 
Amendment / Corrigendum Text :

In line of corrigendum 1, need to modify / correct related issues as required.

Field Name Old Value New Value
Document last selling date & time 24/01/2024 15:00 28/01/2024 15:00
Opening Date & Time 25/01/2024 12:00 29/01/2024 12:00
Last date & time for Tender/Proposal Security Submission 24/01/2024 16:00 28/01/2024 16:00
Closing Date & Time 25/01/2024 12:00 29/01/2024 12:00
TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk [25,00,00,000.00] best Five (5) years over the last [10 (Ten)] years.

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

 

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [19,00,00,000.00]

Liquid assets certificate is accepted only in the following format:
"Letter of Commitment for Bank’s Undertaking for Line of Credit" issued by CPTU
The format is as follows:

Letter of Commitment for Bank’s undertaking for Line of Credit

Invitation for Tender No:
Date:
Tender Package No:
Lot No (when applicable)

To:
[Name and address of the Procuring Entity]


CREDIT COMMITTMENT No: [insert number]
We have been informed that [name of Tenderer] (hereinafter called “the Tenderer”) intends to submit to you its Tender (hereinafter called “the Tender”) for the execution of the Works of [description of works] under the above Invitation for Tenders (hereinafter called “the IFT”).
Furthermore, we understand that, according to your conditions, the Tenderer’s Financial Capacity i.e. Liquid Asset must be substantiated by a Letter of Commitment of Bank’s Undertaking for Line of Credit.
At the request of, and arrangement with, the Tenderer, we [name and address of the Bank] do hereby agree and undertake that [name and address of the Tenderer] will be provided by us with a revolving line of credit, in case awarded the Contract, for execution of the Works viz. [insert name of the works], for an amount not less than BDT[in figure] ( in words) for the sole purpose of the execution of the above Contract. This Revolving Line of Credit will be maintained by us until issuance of “Taking-Over Certificate” by the Procuring Entity.
In witness whereof, authorised representative of the Bank has hereunto signed and sealed this Letter of Commitment.

Signature Signature

 

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:


Contract Value: Tk 24 Cr.
Contract period: 18 months
Assuming work time: 1 month
Invoice period: 0.5 month
Certification Time: 0.5 month
Contingency Time: 1 month

Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The required average annual construction turnover shall be greater than Tk [15,00,00,000.00] best Five (5) years over the last [10 (Ten)] years.

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

 

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [19,00,00,000.00]

Liquid assets certificate is accepted only in the following format:
"Letter of Commitment for Bank’s Undertaking for Line of Credit" issued by CPTU
The format is as follows:

Letter of Commitment for Bank’s undertaking for Line of Credit

Invitation for Tender No:
Date:
Tender Package No:
Lot No (when applicable)

To:
[Name and address of the Procuring Entity]


CREDIT COMMITTMENT No: [insert number]
We have been informed that [name of Tenderer] (hereinafter called “the Tenderer”) intends to submit to you its Tender (hereinafter called “the Tender”) for the execution of the Works of [description of works] under the above Invitation for Tenders (hereinafter called “the IFT”).
Furthermore, we understand that, according to your conditions, the Tenderer’s Financial Capacity i.e. Liquid Asset must be substantiated by a Letter of Commitment of Bank’s Undertaking for Line of Credit.
At the request of, and arrangement with, the Tenderer, we [name and address of the Bank] do hereby agree and undertake that [name and address of the Tenderer] will be provided by us with a revolving line of credit, in case awarded the Contract, for execution of the Works viz. [insert name of the works], for an amount not less than BDT[in figure] ( in words) for the sole purpose of the execution of the above Contract. This Revolving Line of Credit will be maintained by us until issuance of “Taking-Over Certificate” by the Procuring Entity.
In witness whereof, authorised representative of the Bank has hereunto signed and sealed this Letter of Commitment.

Signature Signature

 

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:


Contract Value: Tk 24 Cr.
Contract period: 18 months
Assuming work time: 1 month
Invoice period: 0.5 month
Certification Time: 0.5 month
Contingency Time: 1 month

Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Due to need to change the description in the BOQ item no. 5 and for correction of practical execution time and related issues.

 

Field Name Old Value New Value
Completion Date(Lot No : Single Lot) 15/10/2024 15/04/2026
Document last selling date & time 17/01/2024 15:00 24/01/2024 15:00
Eligibility of Consultant

As per tender document

As per tender document

Opening Date & Time 18/01/2024 12:00 25/01/2024 12:00
Last date & time for Tender/Proposal Security Submission 17/01/2024 16:00 24/01/2024 16:00
Closing Date & Time 18/01/2024 12:00 25/01/2024 12:00
Brief Description of Goods,Works or Service

Renovation of Power Distribution System of main power plant and different substations in/c related works at SAIA, Chattogram.

Renovation of Power Distribution System of main power plant and different substations in/c related works at SAIA, Chattogram.

 