As per tender documents
Shallow Screening, Ballasting, Pulling Back of Railway Track and Construction of Curve Post, Creep Post, Ballast Wall (5400 M) (As Per Type Plan No. CE/W/8235) and Cess-Bank Repair between Belgachi-Pachuria station at KM 228/6-245/5= Total 16.63 KM with loop line including other ancillary works of existing track in AEN/Rajbari section under Divisional Engineer-1, Paksey's jurisdiction.