View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum-1 has been issued due to change in instruction about Form of Line of Credit. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | a) Tenderer must be registered in the e-GP portal through CPTU along with a valid and updated Trade License, Vat Registration and TIN certificate. i) Quantity and quality of work must be checked by BWDB's Task Force |
a) Tenderer must be registered in the e-GP portal through CPTU along with a valid and updated Trade License, Vat Registration and TIN certificate.
i) Quantity and quality of work must be checked by BWDB's Task Force |
| TDS/PDS--C. Qualification Criteria-- | (a) The required average annual construction turnover shall be greater than Tk. 1750.00 Lac [Taka Seventeen Crore Fifty lakh] calculated as total certified amount of works or for contracts in progress or completed. Within the last 05 (Five) years. [Years counting backward from the date of publication of IFT in the newspaper] (b) The minimum amount of free funds (liquid assets) and/or credit facilities net of other Contractual commitments of the successful Tenderer shall be Tk 400.00 Lac [Taka Four Crore]. In case of the credit certificate from bank will be provided as prescribed form Letter of Commitment for Bank’s Undertaking for Line of Credit (Form PW2a-3) without alteration, issued not earlier than 28 days prior to the original deadline of the submission of the tender otherwise it will not be acceptable. This form is available in TDS (Section 7). Here mention that liquid assets is acceptable only form of Line of Credit. If any tender failed this task it will be considered as non-responsive tender for evaluation process. |
(a) The required average annual construction turnover shall be greater than Tk. 1750.00 Lac [Taka Seventeen Crore Fifty lakh] calculated as total certified amount of works or for contracts in progress or completed. Within the last 05 (Five) years. [Years counting backward from the date of publication of IFT in the newspaper] (b) The minimum amount of free funds (liquid assets) and/or credit facilities net of other Contractual commitments of the successful Tenderer shall be Tk 400.00 Lac [Taka Four Crore]. In case of the credit certificate from bank will be provided as prescribed form Letter of Commitment for Bank’s Undertaking for Line of Credit (Form PW3-7) without alteration, issued not earlier than 28 days prior to the original deadline of the submission of the tender otherwise it will not be acceptable. Here mention that liquid assets is acceptable only form of Line of Credit. If any tender failed this task it will be considered as non-responsive tender for evaluation process. |
| Brief Description of Goods,Works or Service | ATCWR-01/Lot-01/2023-2024 Construction of Dakhin Pachim Amtali Drainage Cum Flushing Outlet (1V-1.50x1.80m), Amtali Drainage Cum Flushing Regulator (5V-1.50x1.80m) and Dakhin Poschim Ghotkhali Drainage Cum Flushing Outlet (1V-0.90x1.20m) in Polder no 43/1 at Amtali Upazilla in connection with "Rehabilitation of Polder 43/1 and 44B and protection of vulnerable portion from erosion of the Payra river under Barguna District project" under Barguna O&M Division, BWDB, Barguna during the year 2023-24. |
ATCWR-01/Lot-01/2023-2024 Construction of Dakhin Pachim Amtali Drainage Cum Flushing Outlet (1V-1.50x1.80m), Amtali Drainage Cum Flushing Regulator (5V-1.50x1.80m) and Dakhin Poschim Ghotkhali Drainage Cum Flushing Outlet (1V-0.90x1.20m) in Polder no 43/1 at Amtali Upazilla in connection with "Rehabilitation of Polder 43/1 and 44B and protection of vulnerable portion from erosion of the Payra river under Barguna District project" under Barguna O&M Division, BWDB, Barguna during the year 2023-24. |