1.As per TDS and PCC,General & Particular specification,Drawing etc
2.Tenderer have to submit all the experience certificate in the attached Format uploaded in Particular Specification. 3.(Tenderer have to fill up the form B:Works in Hand attached in particular specification) 4. Tenderer quoted amount more than 10% Less or Above of Official Estimate will be non responsive . 5.In case of Credit facility as liquid asset Tenderer must submit in the format Prescribed by CPTU (PW3-7) otherwise Non-responsive
6.specific experience Certificate should contain 1.Contract or Work order refference No 2 . Actual Final bill payment 3. Actual completion Date.etc Incomplete information in specific experience certificate may lead to non-responsive .
7. BOQ item includes materials cost, labour charge, carrying charge with VAT, Tax & Profit 8. Material issued by the department will be deducted as per departmental rate attached in particular specification 9. Running bill will only be given after adequate water discharge from the Tube Well and Water Test Report have to be submitted to the respective Executive Engineer office. 10. The Defects Liability Period is -09 months 11. The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is 0.01 percent of its Contract price per day of delay. 12. The amount of Performance Security shall be 10 percent of the Contract Price. [Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading ]
Installation of 1 no deep TARA Head Tube Well at Sador upozilla, Netrakona during the FY 2016-17