View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Amendment |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 08/05/2017 16:30 | 14/05/2017 16:30 |
| Opening Date & Time | 09/05/2017 14:00 | 15/05/2017 14:00 |
| PCC--.-- |
The documents to be furnished by the Supplier as follows: |
The documents to be furnished by the Supplier as follows:
Acceptance: Acceptance Certificate will be issued within fourteen (14) days after successfully completion of Post Landing Inspection, Satisfactory R&I report and Successfully completion of related service (if any). |
| PCC--.-- |
The inspections and tests shall be :
i. Post Landing Inspection shall be done after arrival of the goods at Final destination. The post landing inspection shall be intimated to the representative of Supplier. The program of such inspection shall be intimated to the representative of contractor/supplier by BPDB upon arrival of the goods at Final destination store of BPDB. R&I report will be issued after POST-DELIVERY INSPECTION. ii. The purchaser has right to inspect, test and where necessary, reject the Goods arrival in purchaserâ??s store shall in no way be limited or waived by reason of the goods having previously been tested and passed by the manufacturer/ supplier. iii. Detail description is provided in Section 7: Technical Specification Nothing in this clause shall in any way release the Supplier from any warranty or other obligation under provisions of the contract. |
The inspections and tests shall be :
i. Post Landing Inspection shall be done after arrival of the goods at Final destination. The post landing inspection shall be intimated to the representative of Supplier. The program of such inspection shall be intimated to the representative of contractor/supplier by BPDB upon arrival of the goods at Final destination store of BPDB. R&I report will be issued after POST-DELIVERY INSPECTION. ii. The purchaser has right to inspect, test and where necessary, reject the Goods arrival in purchaser’s store shall in no way be limited or waived by reason of the goods having previously been tested and passed by the manufacturer/ supplier. iii. Detail description is provided in Section 7: Technical Specification Nothing in this clause shall in any way release the Supplier from any warranty or other obligation under provisions of the contract. |
| Last date & time for Tender/Proposal Security Submission | 03/04/2017 13:59 | 15/05/2017 13:59 |
| Closing Date & Time | 09/05/2017 14:00 | 15/05/2017 14:00 |
| Amendment / Corrigendum/ Addendum No. : | 2 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Drawing 11 KV Line Post Insulator.pdf | Drawing 11 KV Line Post Insulator | 487084 | ||
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | ITT Clause 22 (m) .(c) ( viii) and (ix) are Amendmend as (viii) Manufacturer's Printed Catalogue for the offered type a) 33 KV Post Insulator b) 11 KV Guy Insulator c) 11 KV Post Insulator describing associated data and information. (ix) Manufacturer’s constructional drawing of the proposed a) 33 KV Post Insulator b) 11 KV Guy Insulator c) 11 KV Post Insulator showing dimension & identification name. And [Provision related with the New Local Manufacturer will be applicable for purchasing less or equal to 5000sets of Pole Fittings (each item)] section of ITT Clause 22 (m) .(c) iii) is Amended as [Provision related with the New Local Manufacturer will be applicable for purchasing less or equal to 5000 sets of Insulator (each item)] |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 02/05/2017 16:30 | 08/05/2017 16:30 |
| Opening Date & Time | 03/05/2017 14:00 | 09/05/2017 14:00 |
| PCC--.-- |
The documents to be furnished by the Supplier as follows: |
The documents to be furnished by the Supplier as follows: |
| PCC--.-- | The following documents shall also be part of the Contract:
i) Performance Guaranty |
The following documents shall also be part of the Contract:
i) Performance Guaranty |
| Closing Date & Time | 03/05/2017 14:00 | 09/05/2017 14:00 |
| TDS/PDS--C. Qualification Criteria-- | (a) The minimum of years of general experience of the Tenderer in the supply of Goods and related services as Supplier shall be 3(three) years, years counting backward from the date of publication of IFT in in the e-GP System. The required information regarding claims under litigation shall be current or during the last 3 (Three) years.
(b) The minimum supply and/or production capacity of Goods is/ are:
(c) The minimum supply and/or production capacity of Goods is/ are: |
(a) The minimum of years of general experience of the Tenderer in the supply of Goods and related services as Supplier shall be 3(three) years, years counting backward from the date of publication of IFT in in the e-GP System. The required information regarding claims under litigation shall be current or during the last 3 (Three) years.
(b) The minimum specific experience as Supplier in supply of similar Goods** of at least 2(two) contract(s) successfully completed within the last 5 (Five) years, years counting backward from the date of publication of IFT in the newspaper, each with a value of at least Tk. 5.00 Crore (Five Crore ).
(c) The minimum supply and/or production capacity of Goods is/ are: |
| TDS/PDS--D. Tender Preparation-- | The amount of the Tender Security shall be Tk. 30 (Thirty) Lac in favour of Director, Directorate of Purchase, BPDB. |
The amount of the Tender Security shall be Tk. 18 (Eighteen) Lac in favour of Director, Directorate of Purchase, BPDB. |
| Tender/Proposal Security (Amount in BDT)(Lot No : 1) | 3000000.0 | 1800000 |