| Brief Description of Works : |
ON CD branch : Construction of ballast protection wall at K.M. 7/2-3 (Left side)-150'-0'', K.M. 7/2-3 (Right side)-80'-0'', K.M. 7/3-4 (Left side)-300'-0'', K.M. 7/4-5 (Left side)-250'-0'', K.M. 7/4-5 (Right side)-50'-0'', K.M. 7/5-6 (Left side)-240'-0'', K.M. 7/6-7 (Left side)-328''-0'', K.M. 7/6-7 (Right side)-150'-0'', K.M. 7/7-8 (Left side)-328'-0'',K.M. 7/7-8 (Right side)-200'-0'', K.M. 7/8-9 (Left side)-325'-0'', K.M. 7/8-9 (Right side)-200''-0'', K.M. 7/9-8/0 (Both side)-400''-0'', K.M. 8/0-8/1 (Left side)-300'-0'',K.M. 8/0-8/1 (Right side)-200'-0'', K.M. 8/1-2 (Right side)-150'-0'', K.M. 8/6-7 (Right side)-150'-0'', K.M. 10/4-6 (Left side)-200'-0'', K.M. 10/4-6 (Right side)-100'-0'', K.M. 10/7-8 (Left side)-50'-0'', K.M. 10/8-9 (Left side)-50'-0'', K.M. 10/9-11/0 (Both side)-200'-0'', K.M. 11/1-2 (Both side)-656'-0'', K.M. 11/2-3 (Both side)-656'-0'', K.M. 11/3-4 (Right side)--328'-0'', K.M. 11/4-5 (Right side)-320'-0'', Total=6361'-0'' in between SLHR-JNHT station including repairs to cess & bank and other allied works as per drawing. No-CE/E-10249.
|